HomeMy WebLinkAboutSHELEY 1 - Spill Release Report - Crestone - 1/29/2021SPILL/RELEASE REPORT (SUPPLEMENTAL) FORM 19 Rev 01/20 State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 This form is to be submitted by the party responsible for the oil and gas spill or release. Refer to COGCC Rule 906.b. for reporting requirements of spills or releases of E&P Waste or produced fluids. Submit a Site Investigation and Remediation Workplan (Form 27) when requested by the Director. Spill report taken by: Spill/Release Point ID: 479236 GINTAUTAS, PETER Document Number: 402585786 Date Received: 01/29/2021 OPERATOR INFORMATON Name of Operator:CRESTONE PEAK RESOURCES OPERATING LLC Operator No:10633 Phone Numbers Phone: Mobile: Email: (303) 7743985 David.Tewkesbury@Cr estonePR.com (720) 2365525 Address: City: Contact Person:David Tewkesbury 1801 CALIFORNIA STREET #2500 DENVER State:CO Zip:80202 Date of Discovery:01/20/202101/20/2021Initial Report Date:Spill Type:Recent Spill Spill/Release Point Location: QTRQTR NESW SEC 4 TWP 2N RNG 67W MERIDIAN 6 Latitude:40.163573 Longitude:-104.899443 `Municipality (if within municipal boundaries):County:WELD Reference Location: Fluid(s) Spilled/Released (please answer Yes/No): Current Land Use: Check if impacted or threatened by spill/Release (please answer Yes/No to all that apply): Waters of the State Residence/Occupied Structure Livestock Public Byway Surface Water Supply Area Was one (1) barrel or more spilled outside of berms or secondary containment? Were Five (5) barrels or more spilled? No No Estimated Total Spill Volume: use same ranges as others for values Estimated Oil Spill Volume(bbl): Estimated Flow Back Fluid Spill Volume(bbl): Estimated Other E&P Waste Spill Volume(bbl): Estimated Condensate Spill Volume(bbl): Estimated Produced Water Spill Volume(bbl): Estimated Drilling Fluid Spill Volume(bbl): 0 0 0 0 Unknown 0 Land Use: NON-CROP LAND Other(Specify): Weather Condition:Sunny, 40 degrees Surface Owner:FEE Other(Specify):The Landhuis Company Specify:Produced Water Secondary containment, including walls & floor regardless of construction material, must be sufficiently impervious to contain any discharge from primary containment until cleanup occurs. As defined in COGCC 100-Series Rules Facility Type:TANK BATTERY Spill/Release Point Name:Sheley 1 separator Facility/Location ID No No Existing Facility or Location ID No. Well API No. (Only if the reference facility is well)05- - INITIAL SPILL/RELEASE REPORT Initial Spill/Release Report Doc#402579452 SPILL/RELEASE DETAIL REPORTS Supplemental Report Date:01/29/2021 FLUIDS OIL CONDENSATE PRODUCED WATER DRILLING FLUID FLOW BACK FLUID OTHER E&P WASTE BBL's SPILLED BBL's RECOVERED 0 0 0 0 0 0 0 0 0 0 Was spill/release completely contained within berms or secondary containment?NO NO Impacted Media (Check all that apply)Soil Groundwater Surface Water Dry Drainage Feature Surface Area Impacted: Length of Impact (feet): Depth of Impact (feet BGS): How was extent determined? Excavation was conducted in order to determine the extent. Impacted soils were removed and transported to a disposal facility. Transport and disposal records will be kept on file under usual and customary practice and are available upon request. Soil samples will be collected and analyzed for COGCC Table 915 constituents of concern until the areal and vertical extents of the excavation are within allowable limits. Soil/Geology Description: Vona Loamy Sand Depth to Groundwater (feet BGS)10 Number Water Wells within 1/2 mile radius:4 Unknown Was an Emergency Pit constructed? A Form 15 Pit Report shall be submitted within 30 calendar days after the construction of an emergency pit #1 specify: Width of Impact (feet): Depth of Impact (inches BGS): Secondary containment, including walls & floor regardless of construction material, must be sufficiently impervious to contain any discharge from primary containment until cleanup occurs. Date Agency/Party Contact Phone Response 1/20/2021 Weld County Weld County online -Submitted online, no response. 1/20/2021 Surface Owner The Landhuis Company 719-635-3200 Jeff Mark, President. OTHER NOTIFICATIONS List Agencies and Other Parties Notified: Describe what is known about the spill/release event (what happened -- including how it was stopped, contained, and recovered): Surfacing of produced water evident at the surface leg of the produced water side of the separator. Water leg isolation control valve is shut. It is believed that all contamination is confined within secondary containment. A work order has been submitted to have the contamination cleaned up. Was there a Grade 1 Gas Leak? If YES, enter the Document Number of the Grade 1 Gas Leak Report Form 44: Was there a reportable accident associated with either a Grade 1 Gas Leak or an E&P waste spill or release? If YES, enter the Document Number of the Initial Accident Report, Form 22: Yes No Yes No Was there damage during excavation?Yes No If YES, was CO 811 notified prior to excavation?Yes No I hereby certify all statements made in this form are to the best of my knowledge true, correct, and complete. Signed:Print Name: Title:Date:Email: Maggie Graham Senior Project Manager 01/29/2021 Maggie.Graham@apexcos.com If less than 1 mile, distance in feet to nearest Water Well 1700 Surface Water 2563 Wetlands 2563 Livestock Occupied Building 1000 Additional Spill Details Not Provided Above: The secondary containment area is contained horizontally by a metal containment wall and vertically by compacted soils. None None None Springs None None None CORRECTIVE ACTIONS Supplemental Report Date:01/29/2021 Root Cause of Spill/Release Other (specify) Describe Incident & Root Cause (include specific equipment and point of failure) Produced-water was found to be surfacing adjacent to the produced-water side of the separator inside secondary containment. The water leg isolation control valve was shut. Produced-water and potentially impacted soils were hydrovacced out. Only preliminary lab data is available at this time and the investigation activities are ongoing. Describe measures taken to prevent the problem(s) from reoccurring: The failed equipment has been shut in and will be repaired. Equipment will be monitored according to routine maintenance intervals. Volume of Soil Excavated (cubic yards): Disposition of Excavated Soil (attach documentation)Offsite Disposal Onsite Treatment Other (specify) #1 Volume of Impacted Ground Water Removed (bbls): Volume of Impacted Surface Water Removed (bbls): Equipment Failure Type of Equipment at Point of Spill/Release:Other If ³Other´selected above, specify or describe here: Horizontal three phase separator Spill/Release Reports should be closed when impacts have been remediated or when further investigation and corrective actions will take place under an approved Form 27. Basis for Closure: Work proceeding under an approved Form 27 Corrective Actions Completed (documentation attached) Form 27 Remediation Project No: REQUEST FOR CLOSURE OPERATOR COMMENTS: This Form 19 Supplemental is being submitted to update the Spill/Release Detail Report for Sheley 1 Separator Spill (Location ID: 318143/Facility ID: 479236) and to include the Corrective Actions summary to the Form 19 Initial report. Results of the remedial investigation activities, including a site map and laboratory analytical results, will be provided on a subsequent Form 19 Supplemental report. Attachment List Att Doc Num Name 402586614 OTHER Total Attach: 1 Files User Group Comment Comment Date Stamp Upon Approval Total: 0 comment(s) General Comments COA Type Description