HomeMy WebLinkAbout22-64 Sun Valley Electric INC. Horizon Well Pump Station 5-11-2022RESOLUTION 114 O.22-64
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE
COLORADO APPROVING A CONTRACT BETWEEN THE TOWN OF FIRESTONE
AND SUN VALLEY ELECTRIC INC FOR THE CONSTRUCTION OF THE
FIRESTONE ALLUVIAL SUPPLY TREATMENT HORIZONTAL WELL PUMP
STATION
WHEREAS, the Town of Firestone ("Town") is in need of a contractor to construct the
Firestone Alluvial Supply Treatment ("FAST") Horizontal Well Pump Station; and
WHEREAS, the Town advertised the project on Bidnet Direct and approximately 50
companies pulled the contract documents and 6 contractors attended the mandatory pre -bid
conference however no bids were submitted; and
WHEREAS, afterwards Sun Valley Electric Inc which is currently asub-contractor on the
St Vrain Water Treatment Plant Project's Reservoir No. 1 Pump Station and Deep Injection Well
Pump Station submitted a bid for the work and upon review the Projects Design Team deemed
Sun Valley Electric Inc qualified to perform the work.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
The Contract between the Town of Firestone and Sun Valley Electric Inc. for the
construction of the FAST Horizontal Well Pump Station is approved in substantially the same
form as the copy attached hereto and made a part of this resolution and the Mayor is authorized
to execute the Contract on behalf of the Town.
INTRODUCED, READ AND ADOPTED this I�1day of ina , 2022.
n : 1
T•
06
��y• �'''�40
Koenig, CMC, T ler , C07*4C , 0
Attorney
--
Alan Peterson, Mayor
SECTION 00510
•11MAU-i WMA11-_:�
Date: May 11, 2022
Project: Firestone FAST Pump Station Project
Owner: Town of Firestone Owner's Contract No.: W2020-9531.02
Contract: Construction Services Engineer's Project No.:
Bidder: Sun Valley Electric, Inc.
Bidder's Address: 5475 East HWY 86, #3
Elizabeth, CO 80107
You are notified that your Bid dated _April 22, 2022
for the above Contract has been considered. You are the Successful Bidder and are awarded a
Contract for the Firestone Horizontal Well Proiect.
The Contract Price of your Contract is � 420,450.00 _
Three (3) copies of the proposed Contract Documents (except Drawings) accompany this Notice of
Award.
Two (2) sets of the Drawings will be delivered separately or otherwise made available to you
immediately.
You must comply with the following conditions precedent within ten (10) days of the date you receive
this Notice of Award.
1. Deliver to the Owner three (3) fully executed counterparts of the Contract Documents,
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the
Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01) and Supplementary
Conditions (Paragraph SC-5.01).
Failure to comply with these conditions within the time specified will entitle Owner to consider you in
default, annul this Notice of Award and declare your Bid security forfeited.
Within ten (10) days after you comply with the above conditions, Owner will return to you one fully
executed counterpart of the Contract Documents.
Copy to Eng
0
ORIN 4
� `�-..Owner: Town of Firestone
m -
Mayor
EJCDC C-510 Notice of Award
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
00510-1 of 1
THIS AGREEMENT is by and between
Stuff Valley Elech is Inc.
SECTION 00520
AGREEMENT
Town of Firestone
Owner and Contractor hereby agree as follows:
ARTICLE 1 —WORK
("Owner") and
("Contractor") .
1.01 Contractor shall complete all Worl< as specified or indicated in the Contract
Documents. The Work is generally described as follows:
Furnish bonds, insurance, and permits required by Section 01035. Mobilization
to and demobilization from the construction site, including any requisite site
access improvements and site reclamation. Furnish and install water delivery
infrastructure at one (1) location, including all appurtenances. Furnish and
install one (1) water delivery pumping station, including building and all
appurtenances. Furnish and install water delivery pipelines, including all
appurtenances. Provide and install key finishes and complete site restoration.
Provide and install site instrumentation, telemetry, and control systems,
including all appurtenances.
ARTICLE 2 -THE PROJECT
2.01 The Project for which the Worl< under the Contract Documents may be the whole or
only a part is generally described as follows:
Firestone FAST Pump Station
ARTICLE 3 —ENGINEER
3.01 The Project was designed in part by MCGRANE WATER ENGINEERS (Engineer), which
is to act as Owner's representative, assume all duties and responsibilities and have
the rights and authority assigned to Engineer in the Contract Documents in
connection with the completion of the Work in accordance with the Contract
Documents.
ARTICLE 4 -CONTRACT TIMES
4.01
4.02
Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion and completion and
readiness for final payment as stated in the Contract Documents are of the essence
of the Contract.
Days to Achieve Substantial Completion and Final Payment
This project will reach substantial completion by August 15, 2022. Work can be
sequenced and planned as needed and desired by the selected Contractor in order
to meet their needs and schedules as long as the completion dates set forth are
maintained.
00520-1
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph
4.01 above and that Owner will suffer financial loss if the Work is not completed
within the times specified in Paragraph 4.02 above, plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions. The parties also
recognize the delays, expense and difficulties involved in proving in a legal or
arbitration proceeding, the actual loss suffered by Owner if the Work is not
completed on time. Accordingly, instead of requiring any such proof, Owner and
Contractor agree that as liquidated damages for delay (but not as a penalty),
Contractor shall pay Owner one thousand four hundred dollars ($1,400.00) for
each day that expires after the time specified in Paragraph 4.02 above for
Substantial Completion until the Work is substantially complete. After Substantial
Completion, if Contractor shall neglect, refuse or fail to complete the remaining
Work within the Contract Time or any proper extension thereof granted by Owner,
Contractor shall pay Owner one thousand four hundred dollars ($1,400.00) for
each day that expires after the time specified in Paragraph 4.02 above for
completion and readiness for final payment until the Work is completed and ready
for final payment.
5.01 Owner shall pay Contractor for completion of the Work in accordance with the
Contract Documents an amount in current funds equal to the sum of the amounts
determined pursuant to Paragraphs 5.01 A below:
A. For all Work, at the prices stated in the Contractor's Bid, attached hereto as an
exhibit.
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of
the General Conditions. Applications for Payment will be processed by Engineer as
provided in the General Conditions,
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis
of Contractor's Applications for Payment on or about the 4th Wednesday of each
month, for the previous months work, during performance of the Work as provided
in Paragraph 6.02 A 1 below. All such payments will be measured by the schedule
of values established as provided in Paragraph 2.07 A of the General Conditions
(and in the case of Unit Price Work based on the number of units completed) or, in
the event there is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount
equal to the percentage indicated below but, in each case, less the aggregate
of payments previously made and less such amounts as Engineer may
determine or Owner may withhold, including but not limited to liquidated
damages, in accordance with Paragraph 14.02 of the General Conditions.
a. 95 percent of Work completed (with the balance being retainage), and
00520-2
b. 90 percent of cost of materials and equipment procured, insured, and
satisfactorily stored on -site but not incorporated in the Work (with the
balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase
total payments to Contractor to 100 percent of the Work completed, less such
amounts as Engineer shall determine in accordance with Paragraph 14.02 B 5 of
the General Conditions and less 200 percent of Engineer's estimate of the value of
Work to be completed or corrected as shown on the tentative list of items to be
completed or corrected attached to the certificate of Substantial Completion,
6.03 Fina! Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph
14.07 of the General Conditions, Owner shall pay the remainder of the Contract
Price as recommended by Engineer as provided in said Paragraph 14.07,
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions
shall bear interest at the rate of 1_0 percent per annum.
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the
following representations:
A. Contractor has examined and carefully studied the Contract Documents and the
other related data identified in the Bidding Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to the
generalI local and Site conditions that may affect cost, progress and performance
of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state and local Laws and
Regulations that may affect cost, progress and performance of the Work.
D. Contractor has carefully studied all: (1) reports of explorations and tests of
subsurface conditions at or contiguous to the Site and all drawings of physical
conditions relating to existing surface or subsurface structures at the Site (except
Underground Facilities), if any, that have been identified in Paragraph S&4.02 of
the Supplementary Conditions as containing reliable "technical data", and (2)
reports and drawings of Hazardous Environmental Conditions, if any, at the Site
that have been identified in Paragraph SG4.06 of the Supplementary Conditions as
containing reliable "technical data".
E. Contractor has considered the information known to Contractor; information
commonly Known to contractors doing business in the locality of the Site;
information and observations obtained from visits to the Site; the Contract
Documents; and the Site -related reports and drawings identified in the Contract
Documents, with respect to the effect of such information, observations and
documents on (1) the cost, progress and performance of the Work; (2) the means,
methods, techniques, sequences and procedures of construction to be employed by
Contractor, including any specific means, methods, techniques, sequences and
00520-3
procedures of construction expressly required by the Contract Documents; and (3)
Contractor's safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 8.01 E above,
Contractor does not consider that further examinations, investigations,
explorations, tests, studies or data are necessary for the performance of the Work
at the Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents.
G. Contractor is aware of the general nature of work to be performed by Owner and
others at the Site that relates to the Work as indicated in the Contract Documents,
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities or
discrepancies that Contractor has discovered in the Contract Documents, and the
written resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing of the
Work.
J. Contractor shall perform no less than 70% of the work with their own forces.
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (pages 1 to 6, inclusive).
2. Performance bond.
3. Payment bond.
4. General Conditions.
5. Supplementary Conditions.
6. Specifications as listed in the table of contents of the Project Manual.
7. Drawings with each sheet bearing the following general title and number of
sheets (shown in parenthesis):
"Firestone FAST Pump Station Project" (_ sheets)
8. Addenda (numbers 0 to 0, inclusive).
9. Exhibits to this Agreement (enumerated as follows):
a. Contractor's Bid.
b. Documentation submitted by Contractor prior to Notice of Award.
10. The following which may be delivered or issued on or after the Effective Date of
the Agreement and are not attached hereto:
00520-4
a. Notice to Proceed.
b. Change Orders,
B. The documents listed in Paragraph 9.01 A are attached to this Agreement (except
as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified or supplemented as
provided in Paragraph 3.04 of the General Conditions,
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General
Conditions and the Supplementary Conditions,
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract
will be binding on another party hereto without the written consent of the party
sought to be bound, and, specifically but without limitation, moneys that may
become due and moneys that are due may not be assigned without such consent
(except to the extent that the effect of this restriction may be limited by law), and
unless specifically stated to the contrary in any written consent to an assignment,
no assignment will release or discharge the assignor from any duty or
responsibility under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, its partners, successors, assigns and
legal representatives in respect to all covenants, agreements and obligations
contained in the Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining
provisions shall continue to be valid and binding upon Owner and Contractor, who
agree that the Contract Documents shall be reformed to replace such stricken
provision or part thereof with a valid and enforceable provision that comes as close
as possible to expressing the intention of the stricken provision.
00520-5
Contractor's Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive or
coercive practices in competing for or in executing the Contract. For the purposes
of this Paragraph 10.05.
1. "corrupt practice" means the offering, gg, receiving or soliciting of anything
of value likely to influence the action of a public official in the bidding process
or in the Contract execution;
2. "fraudulent practice" means an intentional misrepresentation of facts made (a)
to influence the bidding process or the execution of the Contract to the
detriment of Owner, (b) to establish Bid or Contract prices at artificial non-
competitive levels or (c) to deprive Owner of the benefits of free and open
competition;
3. "collusive practice" means a scheme or arrangement between two or more
Bidders, with or without the knowledge of Owner, a purpose of which is to
establish Bid prices at artificial, non-competitive levels; and
4. "coercive practice" means harming or threatening to harm, directly or
indirectly, persons or their property to influence their participation in the
bidding process or affect the execution of the Contract.
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. Counterparts have been
delivered to Owner and Contractor. All portions of the Contract Documents have been signed or have
been identified by Owner and Contractor or on their behalf.
This Agreement will be effective on
OWNER:
Town of Firestone
Title: Manor
Attest %� �
Title: Towin/Clerk
Address for giving notices: L�
�O �0.1(1iC_ IAV 2.
Firestone, CO
CONTRACTOR
Sun Valley Elech•ic Inc.
Title: Vice President
(If Contractor is a corporation, a partnership
or a joint venture, attach evidence of
authority to sign.)
Attest.
Title: Conh•oller
Address for giving notices.
5475 Hwy 86 #3
Elizabeth.
CO 80107
License No.: 21A-2245
00520-6