Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Temporary Closure of Sable Avenue - 7/26/2019
Temporary Closure of Sable Avenue Beginning Monday, July 29th, contractors will be closing a portion of Sable Avenue between the I-25 Frontage Road and Birch Street (WCR 22) during the day. The purpose of the closure is to install two new water pipeline crossings. The roadway will be closed beginning at 7:00 a.m. on Monday, July 29, 2019 and will fully reopen no later than 7:00 p.m. on Wednesday, July 31, 2019. During the evenings, Sable Avenue will be open to traffic but motorists are urged to pay close attention to traffic control signs, reduce speeds and, if possible, avoid the construction area during that time. View a map of the detour route here. If you have any questions please contact the Town Engineer, Dave Lindsay, at 970-278- 0029, ext. 108. Share on Facebook Share on Twitter Share via Email Copyright © 2019 Town of FIrestone. All Rights Reserved. 151 Grant Ave. Firestone, CO 80520 Powered by