HomeMy WebLinkAboutWAGNER 8-25 - Well Abandonment Report - Kerr McGee - 11/1/2022Casing Type Size of
Hole
Size of
Casing
Grade Wt/Ft Csg/Liner
Top
Setting
Depth
Sacks Cmt Cmt Btm Cmt Top Status
SURF 12+1/4 8+5/8 J-55 24 656 460 656 0 VISU
1ST 7+7/8 4+1/2 I-80 11.6 7368 435 7368 3956 CBL
Casing History
Subsequent Report of Abandonment
Details:
If yes, explain details below
If yes, explain details below
Yes NoWellbore has Uncemented Casing leaks:
NoYesFish in Hole:
860Estimated Depth:NoYesCasing to be pulled:
Other
Mechanical ProblemsProduction Sub-economicDryReason for Abandonment:
-104.94414040.198800 Longitude:
GPS Data:
Only Complete the Following Background Information for Intent to Abandon
2.1 11/21/2006GPS Quality Value:Date of Measurement:
Latitude:
Type of GPS Quality Value:PDOP
90750Field Number:Field Name:WATTENBERG
Federal, Indian or State Lease Number:
Meridian:668W Range:Township:3N 25Section:QtrQtr:
8-25 Well Number:
SENE
County:WELD
Location:
WAGNERWell Name:
05-123-21897-00API Number
This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the
abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The
approved intent shall be valid for six months after the approval date, after that period, a new intent will be required.
Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed
configuration with plugs set.
A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent
Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all
plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run
during abandonment.
State of Colorado
Oil and Gas Conservation Commission
1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894
-2109
WELL ABANDONMENT REPORT
FORM
6
Rev
11/20
Notice of Intent to Abandon
Lindsay_Davis@oxy.comEmail:
Fax:
(970) 515-1616Phone:
Zip:80217-
3779
COState:DENVER
P O BOX 173779
Contact Name:
City:
Lindsay Davis
Address:
KERR MCGEE OIL & GAS ONSHORE LPName of Operator:
47120OGCC Operator Number:
craig.carlile@state.co.usEmail:
Tel:(970) 629-8279Name:Carlile, Craig For "Intent" 24 hour notice required,
COGCC contact:
11/01/2022
Date Received:
Document Number:
DE ET OE ES
403210207
Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth
CODELL 7208 7226 02/20/2014 BRIDGE PLUG 6877
NIOBRARA 6958 7132 02/20/2014 BRIDGE PLUG 6877
Total: 2 zone(s)
Current and Previously Abandoned Zones
Type of Well Abandonment Report:
Page 1 of 5Date Run: 11/10/2022 Doc [#403210207] Well Name: WAGNER 8-25
Technical Detail/Comments:
BMPs
Signage for P&As:
Prior to commencing operations, KMG will post signs in conspicuous locations. The signs will indicate plugging and abandonment
operations are being conducted, the well name, well, and the Operator’s contact information. Signs will be placed so as not to create
a potential traffic hazard.
Notifications:
Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our
plugging and abandonment operations and providing contact information for Kerr McGee’s response line and online resources.
Wellbore Pressure:
In some cases, wellbore pressure drawdown operations may occur approximately 1-2 days prior to Move In Rig Up (MIRU) of the
workover rig. This is conducted to allow for reduced time that the workover rig is needed on location. These operations will be
conducted in accordance with Form 4 and/or Form 6 requirements.
Water:
Water will be placed on dirt access roads to mitigate dust as needed.
Lighting:
Operations are daylight-only; no lighting impacts are anticipated from operations.
Noise:
Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered
to reduce noise levels to nearby building units.
Environmental Concerns:
This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & COGCC data) as well
as internal wildlife datasets and aerial imagery. No risks were identified. All field personal are trained to identify wildlife risks and
raise concerns noticed during operations with the Health, Safety, and Environment (HSE) department.
NoYesFlowline/Pipeline has been abandoned per Rule 1105
Type of Cement and Additives Used:
*Cementing Contractor: *Wireline Contractor:
Cut and Cap Date:
inch casingft. of
Additional Plugging Information for Subsequent Report Only
Casing Recovered:
Plug Tagged: Plug Type:
Plug Tagged: Plug Type:
Plug Tagged:CASINGPlug Type:
Plug Tagged:CASINGPlug Type:
Plug Tagged:CASING
Plug Tagged:
(Cast Iron Cement Retainer Depth)
CICR Depth
CICR Depth
1160
2160
CICR Depth4084
sacks cmt on top.withCIBP #5: Depth
sacks cmt on top.withsacks cmt on top. CIBP #4: DepthwithCIBP #3: Depth
Set sacks in mouse holeSetsacks in rat hole
NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate
100Set sacks at surface
ft.606ft. to756sacks half in. half out surface casing fromSet95
sacks. Leave at least 100 ft. in casing211ft. with1800Perforate and squeeze at
sacks. Leave at least 100 ft. in casing211ft. with2800Perforate and squeeze at
sacks. Leave at least 100 ft. in casing95ft. withPerforate and squeeze at 4144
ft. ft. tosks cmt fromSet
ft. ft. tosks cmt fromSet
ft. 900ft. to1160sks cmt fromSet19
ft. 1900ft. to2160sks cmt fromSet19
ft. 4019ft. to4084sks cmt from5Set
sacks cmt on top.260 with 100sacks cmt on top. CIBP #2: Depth2with6880CIBP #1: Depth
Plug Type:
NOTE: Two(2) sacks cement
required on all CIBPs.
Plugging Procedure for Intent and Subsequent Report
I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete.
Surface Plug Setting Date:
Number of Days from Setting Surface Plug
to Capping or Sealing the Well:
Page 2 of 5Date Run: 11/10/2022 Doc [#403210207] Well Name: WAGNER 8-25
5/9/2023Expiration Date:
Haverkamp, Curtis
Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable
orders and is hereby approved.
COGCC Approved:Date:11/10/2022
Signed:Print Name:Lindsay Davis
Title:Regulatory Tech Date:11/1/2022 Email:Lindsay_Davis@oxy.com
CONDITIONS OF APPROVAL, IF ANY:
Page 3 of 5Date Run: 11/10/2022 Doc [#403210207] Well Name: WAGNER 8-25
COA Type Description
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap,
conducting flowline abandonment, or removing production equipment. Allow 30 days for
Director review of the Form 27; include the Form 27 document number on the Form 44
for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent.
Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place,
include with the Form 27: pressure test results conducted in the prior 12 months as well
as identification of any document numbers for a COGCC Spill/Release Report, Form
19, associated with the abandoned line.
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and
electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for
plugging operations. These are two separate notifications, required by Rules 405.e and
405.l.
2) Prior to placing the 1800’ plug: verify that all fluid (liquid and gas) migration has been
eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer
for an update to plugging orders.
3) If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag
plug – must be at 606’ or shallower and provide a minimum of 10 sx plug at the surface.
4) Leave at least 100’ of cement in the wellbore for each plug without mechanical
isolation.
5) With the Form 6 SRA operator must provide written documentation which positively
affirms each COA listed above has been addressed.
Prior to starting plugging operations a bradenhead test shall be performed if there has
not been a reported bradenhead test within the 60 days immediately preceding the start
of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25
psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during
the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with
Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are
collected, copies of all final laboratory analytical results shall be provided to the COGCC
within three (3) months of collecting the samples.
If there is a need for sampling, contact COGCC engineering for verification of plugging
procedure.
COA's provided by the operator as Best Management Practices under Technical Detail/
Comments:
Operations will be in compliance with Table 423-1 requirements. Based off the rig
sound signature, rig orientation will be considered to reduce noise levels to nearby
building units.
COA's provided by the operator as Best Management Practices under Technical Detail/
Comments:
Courtesy notifications will be sent to all parcel owners with building units within 1,500
feet of the location letting them know about our plugging and abandonment operations
and providing contact information for Kerr McGee’s response line and online resources.
COA's provided by the operator as Best Management Practices under Technical Detail/
Comments:
Prior to commencing operations, KMG will post signs in conspicuous locations. The
signs will indicate plugging and abandonment operations are being conducted, the well
name, well, and the Operator’s contact information. Signs will be placed so as not to
create a potential traffic hazard.
6 COAs
Page 4 of 5Date Run: 11/10/2022 Doc [#403210207] Well Name: WAGNER 8-25
Attachment List
Att Doc Num Name
403210207 WELL ABANDONMENT REPORT (INTENT)
403210229 PROPOSED PLUGGING PROCEDURE
403210232 WELLBORE DIAGRAM
403225453 FORM 6 INTENT SUBMITTED
Total Attach: 4 Files
User Group Comment Comment Date
Engineer DWR base of Fox Hills: 164'
Deepest water well within 1 mile: 200'
Bradenhead history: 44psi (4/1/2022)
11/10/2022
OGLA OGLA review is complete.11/03/2022
Permit Type of GPS Quality Value missing - selected PDOP from dropdown box
Email verified: Designated Agent listed as Lindsay Davis - married name for Lindsay
Frase
Verified as drilled lat/long - Google Earth/COGIS
Verified completed intervals (Docs 1046764 - perfs off, 12321897, 12321897(2),
401068302)
Verified production reporting
Review complete and task passed
11/01/2022
Total: 3 comment(s)
General Comments
Page 5 of 5Date Run: 11/10/2022 Doc [#403210207] Well Name: WAGNER 8-25
ANADARKO PETROLEUM CORPORATION
Please contact your area engineer with any questions concerning this procedure.
10/27/2022
PLUG and ABANDONMENT PROCEDURE
WAGNER 8-25 API: 05-123-21897
Step Description
1 Review Previous Open Wells Reports/Well History. If you have questions or concerns, contact Foreman/Engineer.
2 COA: Provide 48 hour notice to COGCC prior to rig up per request on approved Form 6 (e.g. call field coordinator, submit Form
42, etc.).
3 Notify Automation Removal Group at least 24 hours prior to rig move. Request they catch and remove plunger, isolate production
equipment, and remove any automation prior to rig MIRU.
4 MIRU Slickline. Pull production equipment and tag bottom. Record tag depth, casing/tubing pressures and fluid level in Open
Wells. Gyro was run on 12/03/13. RDMO Slickline.
5 Prepare location for base beam equipped rig. Install perimeter fence as needed.
6 COA: Verify Form 17 (State Bradenhead Test) has been run within 60 days of RU.
7
Refer to the Rockies Well Services Guidelines document whenever rigging up BOP and WL, or whenever tripping in or out of the
well. Consult with Foreman/Engineer before deviating from these guidelines. All cement jobs (excluding injections squeezes) must
be pumped at 4-6 BPM. All cement plugs pumped through tubing must use the Diverter tool. Final top-out can be pumped between
2-4 BPM.
8
Upon RU, check and record bradenhead pressure. If bradenhead valve is not accessible, re-plumb so that valve is above GL. Blow
down bradenhead and leave open during working hours. Re-check pressure each day and input value in the "Casing press." box in
Open Wells.
9
MIRU WO rig. Verify BOP and wellhead rating, inspect for appropriate API standards, pressure test BOP. Kill well as necessary
using biocide treated fresh water. ND WH. NU BOP. Unland tbg. **Barrier Management** Fluid will be the only barrier while NU
BOP. Stop and review JSA.
10 TIH to 6846' and circulate sand off RBP and then retrieve RBP. TOOH. TIH to 6877' to retrieve RBP. TOOH and SB all 2-3/8" tbg and
LD retrieving head.
11 TOOH and SB 2-3/8" tbg. LD remaining 2-3/8" tbg.
12 MIRU WL. PU and RIH with (4-1/2, 11.6#) gauge ring to 6890'. POOH.
13 PU and RIH with (4-1/2, 11.6#) CIBP and set at +/- 6880'. POOH. Slowly top fill well to clear out all gas. Pressure test CIBP to 500
psi. RIH and dump 2 sx cement on CIBP. POOH.
14 COA: Confirm and document static conditions in the well before placing the next plug. If there is evidence of pressure or fluid
migration at any time after placing the Niobrara plug, contact Engineering.
15 PU and RIH with one 4', 3-1/8'' deep penetrating perf gun wth 4 spf. Shoot squeeze holes at 4144'. POOH. RDMO WL.
16 Establish an injection rate with treated water. Record rate and pressure results and report them to the Foreman/Engineer.
Plugging orders may change based on results. When 1 bpm is achieved, record pressure and successful test has been completed.
17 PU and TIH with (4.5", 11.6#) CICR on 2.375" tbg. Set CICR at 4084'.
18
MIRU cementers. Pump Squeeze: 100 sx (21.2 bbl or 119 cf) of the AGM Sus blend: 2% Gypsum, 0.4% Latex, 0.25% Fluid Loss, 0.3%
Dispersant. Underdisplace by 1 bbls. Volume is based on 60' in the casing below the CICR, cement squeezed into formation, and
65' on top of the CICR. Collect wet and dry samples of cement to be left on rig. RDMO Cementers
19 Pull out of cement. TOOH to 4019’. Reverse circulate 2x well volume to ensure no cement is left in the tbg.
20 TOOH and SB 2.375" tbg. LD stinger, and remaining tbg.
21 MIRU WL. PU and RIH with two 4', 3-1/8'' perf guns with 4 spf. Shoot 16 squeeze holes at 2800' and 16 squeeze holes at 2100'.
RDMO WL.
22 PU and TIH with (4.5", 11.6#) packer on 2.375" tbg. Set packer at 2160'.
23 Initiate circulation at low rate monitoring returns for fluid. Add mud thinner to hydrate/clean mud. Slowly increase circulation rate
to 4-6 BPM using mud thinner and gel polymer sweeps as needed.
24 Pump 50 bbls of 160F HSF (0.5 gals/bbl or 1.5 lbs/bbl) and let soak for ~2 hours.
25 Continue circulating at 4-6 BPM if possible. If returns show hydrocarbons or a 1 hr build-up shows pressure, swab and vent well and
clean open tank. Circulate clean fluid before pumping cement.
26 Release packer. TOOH, SB 2.375" tbg. LD packer.
27 PU and TIH with (4.5", 11.6#) CICR on 2.375" tbg. Set CICR at 2160'.
28
MIRU cementers. Pump 10 bbls (min) of pre-flush, followed by 5 bbls fresh water spacer. Pump Squeeze: 230 sx (49.5 bbl or 278 cf)
of the AGM Lwr blend: 1% CaCl, 4% Gypsum, 0.4% Latex. Underdisplace by 4 bbls. Volume is based on 640' in the casing below the
CICR, 700' in the casing-hole annulus with 25% excess, and 260' on top of the CICR. Collect wet and dry samples of cement to be
left on rig. RDMO Cementers.
29 Pull out of cement. TOOH to 1900’. Reverse circulate 2x well volume to ensure no cement is left in the tbg.
30 TOOH and SB 2.375" tbg. LD stinger, and remaining tbg.
31 MIRU WL. PU and RIH with two 4', 3-1/8'' perf guns with 4 spf. Shoot 16 squeeze holes at 1800' and 16 squeeze holes at 1100'.
RDMO WL.
32 PU and TIH with (4.5", 11.6#) packer on 2.375" tbg. Set packer at 1160'.
33 Initiate circulation at low rate monitoring returns for fluid. Add mud thinner to hydrate/clean mud. Slowly increase circulation rate
to 4-6 BPM using mud thinner and gel polymer sweeps as needed.
34 Pump 50 bbls of 160F HSF (0.5 gals/bbl or 1.5 lbs/bbl) and let soak for ~2 hours.
35 Continue circulating at 4-6 BPM if possible. If returns show hydrocarbons or a 1 hr build-up shows pressure, swab and vent well and
clean open tank. Circulate clean fluid before pumping cement.
36 Release packer. TOOH, SB 2.375" tbg. LD packer.
37 PU and TIH with (4.5", 11.6#) CICR on 2.375" tbg. Set CICR at 1160'.
38
MIRU cementers. Pump 10 bbls (min) of pre-flush, followed by 5 bbls fresh water spacer. Pump Squeeze: 230 sx (49.5 bbl or 278 cf)
of the AGM Upr blend: 1.5% CaCl, 4% Gypsum, 0.4% Latex. Underdisplace by 4 bbls. Volume is based on 640' in the casing below
the CICR, 700' in the casing-hole annulus with 25% excess, and 260' on top of the CICR. Collect wet and dry samples of cement to
be left on rig. RDMO Cementers.
39 Pull out of cement. TOOH to 900’. Reverse circulate 2x well volume to ensure no cement is left in the tbg.
40 TOOH and SB 2.375" tbg. LD stinger, and remaining tbg.
41 COA: WOC 8 hours. If there is evidence of pressure or fluid migration, contact Engineering as there will need to be additional
remediation attempts before the SC shoe plug.
42 PU and TIH with mechanical cutter on 2-3/8 tbg. Cut 4-1/2, 11.6# casing at 756'. TOOH and LD cutter.
43 Attempt to establish circulation with biocide treated fresh water.
44 ND BOP. ND TH. Un-land casing. Rig max pull shall be 100,000#. Max pull over string weight shall be 50,000#. If unable to unland,
contact Foreman/Engineer. **Barrier Management** Fluid will be the only barrier while unlanding casing. Stop and review JSA.
45 Install BOP on casing head with 4-1/2", 11.6# pipe rams. **Barrier Management** Fluid will be the only barrier while NU BOP.
Stop and review JSA.
46 TOOH and LD all 4-1/2", 11.6# casing. Remove 4-1/2", 11.6# pipe rams and install 2-3/8" pipe rams.
47 TIH with diverter tool on 2-3/8 tbg to 756'. Establish circulation to surface with biocide treated fresh water and circulate bottoms
up.
48 Initiate circulation at low rate monitoring returns for fluid. Add mud thinner to hydrate/clean mud. Slowly increase circulation rate
to 4-6 BPM using mud thinner and gel polymer sweeps as needed.
49 Pump 21 bbls of 160F HSF (0.125 gals/bbl or 0.5 lbs/bbl) and let soak for ~2 hours.
50 Continue circulating at 4-6 BPM if possible. If returns show hydrocarbons or a 1 hr build-up shows pressure, swab and vent well and
clean open tank. Circulate clean fluid before pumping cement.
51 COA: Verify and document that all pressure and fluid migration has been eliminated prior to placing the SC shoe plug at 756'. If
there is evidence of pressure or fluid migration, contact Engineering.
52
MIRU cementers. Pump 10 bbls (min) of pre-flush, followed by 5 bbls fresh water spacer. Pump Surface Casing Shoe Plug: Pump 95
sx (20.6 bbl or 115 cf) of the AGM Surf blend: 2% CaCl, 4% Gypsum, 0.4% Latex Volume is based on 100' in 7.875 bit size open hole
with 30% excess factor, 200' in the 8-5/8, 24# surface casing with no excess. The plug is designed to cover 756'-456'. Collect wet
and dry samples of cement to be left on rig. RDMO Cementers. Notify engineering if circulation is ever lost during job.
53 COA: If cement was not circulated to surface, then WOC 4 hours. Tag TOC. TOC must be 606' or shallower. If tag is too deep or
there is evidence of pressure or fluid migration, contact Engineering.
54 Pull out of cement. TOOH to 260'. Forward circulate tbg clean with fresh water. TOOH & SB 260' of tubing. Plug can be tagged
after 4 hours, but must have a 6 hour WOC before PT.
55 ND 7-1/16" BOP. NU 9" or 11" BOP. RIH with bit and scraper. Clean csg and tag TOC. Circulate Clean. POOH. PT casing to 500 psi.
Contact engineering if test fails.
56 TIH with diverter tool on 2-3/8 tubing to 260' and pump 17 bbls of 160F HSF (0.125 gals/bbl or 0.5 lbs/bbl) to fill Csg & Flush Csg
Valves. Let soak for 1 hour. Circulate out with water.
57 MIRU WL. PU and RIH with (8-5/8, 24#) CIBP and set at 260'. POOH. RDMO WL.
58
MIRU Cementers. Pump Surface Plug: Pump 100 sx (21.6 bbl or 121 cf) of the AGM Surf blend: 2% CaCl, 4% Gypsum, 0.4% Latex.
Volume based on 260’ inside 8-5/8, 24# surface casing with no excess. Cement will be from 260' to surface. This includes 5
additional bbls for contamination. Verify and document cement to surface. Collect wet and dry samples of cement to be left on rig.
59 TOOH and remove diverter tool. Insert ~5' of 2-3/8" Tbg. Circulate FW to clean Csg & Csg Valves. LD final joint of 2-3/8" Tbg. RDMO
cementers. ND BOP. Install night cap. RDMO WO rig.
60 Instruct cementing and wireline contractors to e-mail copies of all job logs/job summaries to rscDJVendors@anadarko.com within
24 hours of completion of the job.
61 Supervisor submit paper copies of all invoices, logs, and reports to VWP Engineering Specialist.
62 Excavation crew to notify One Call to clear excavation area around wellhead and for flow lines.
63 Excavate hole around surface casing enough to allow welder to cut casing a minimum 5’ below ground level.
64 Welder cut casing minimum 5' below ground level.
65 Spot weld on steel marker plate. Marker should contain Well name, Well number, legal location (1/4 1/4 descriptor) and API
number.
66 Obtain GPS location data as per COGCC Rule 215 and send to rscDJVendors@anadarko.com.
67 Properly abandon flow lines per Rule 1103. File electronic Form 42 once abandonment is complete.
68 Back fill hole with fill. Clean location, and level.
69 Submit Form 6 to COGCC ensuring to provide 'As performed' WBD identifying operations completed.
API: 05-123-21897 QTR-QTR:SENE
WELL NAME: WAGNER 8-25 SECTION:25
COUNTY:WELD TWNSHIP:3N
LATITUDE:40.1987918 RANGE:68W
LONGITUDE:-104.9441478 CREATED BY:
Existing Proposed
KB=12'
Hole Size/Depth 12-1/4" / 666'100 sx cmt to surface
260'260'CIBP/BOC
Surface Casing 8-5/8", 24#/ft set @ 656'95 sx 606'TOC in S.C.
756'BOC/Casing Cut
Fox Hills Marker 760'
19 sx 900'TOC in csg
<>1100'Perf
1160'1160'CICR
<211 sx >1800'Perf/BOC
19 sx 1900'TOC in csg
<>2100'Perf
2160'2160'CICR
<211 sx >2800'Perf/BOC
TOC (from CBL)3956'
5 sx 4019'TOC in csg
Sussex 4084'4084'CICR
Top 4144'<95 sx >4144'Perf/BOC
Base 4298'
NOT productive within 1 mile
Shannon 4648'
NOT productive within 1 mile
Retrievable Bridge Plug 6846'
Retrievable Bridge Plug 6877'2 sx
6880'
Niobrara Top 6948'Existing Cement
Niobrara Perfs 6958' - 7132'New CICR
Existing CICR
Codell Perfs 7208' - 7226'New CIBP
Existing CIBP
New Cement
Hole Size/Depth 7-7/8" / 7375'Sand Plug
Production Casing 4-1/2", 11.6#/ft set @ 7368'Existing Mud
DATE:10/27/2022
DATUM: RKB
ELEVATION:
GROUND LEVEL:
MD:
PBMD:
C. Bissmeyer
4892
4880
7375
7340