HomeMy WebLinkAboutCARMA 41-36 - Well Abandonment Report - Kerr McGee - 10/3/2018Status VISU0838SURF 12+1/4 8+5/8 24 838 530 CBL7,8108,0551ST 7+7/8 4+1/2 11.6 8,055 50 CBL8308,000Stage Tool 7,799 980 Casing Type Size of Hole Size of Casing Weight Per Foot Setting Depth Sacks Cement Cement TopCement Bot Casing History Subsequent Report of Abandonment Details: If yes, explain details below If yes, explain details below Yes NoWellbore has Uncemented Casing leaks: NoYesFish in Hole: 800Estimated Depth:NoYesCasing to be pulled: Other Mechanical ProblemsProduction Sub-economicDryReason for Abandonment: -104.94659440.187637 Longitude: GPS Data: Only Complete the Following Background Information for Intent to Abandon Renee Doiron2.209/12/2011 GPS Instrument Operator's Name:PDOP Reading:Date of Measurement: Latitude: 90750Field Number:Field Name:WATTENBERG 72/2840 Federal, Indian or State Lease Number: Meridian:668W Range:Township:3N 36Section:QtrQtr: 41-36 Well Number: NWNE County:WELD Location: CARMAWell Name: 05-123-31103-00API Number This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed configuration with plugs set. A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run during abandonment. State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 WELL ABANDONMENT REPORT FORM 6 Rev 05/18 Notice of Intent to Abandon cheryl.light@anadarko.comEmail: (720) 929-7461Fax: (720) 929-6461Phone: Zip:80217- 3779 COState:DENVER P O BOX 173779 Contact Name: City: CHERYL LIGHT Address: KERR MCGEE OIL & GAS ONSHORE LPName of Operator: 47120OGCC Operator Number: craig.carlile@state.co.usEmail: Tel:(970) 629-8279Name:Carlile, Craig For "Intent" 24 hour notice required, COGCC contact: 10/03/2018 Date Received: Document Number: DE ET OE ES 401782815 Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth CODELL 7445 7463 J SAND 7888 7920 NIOBRARA 7230 7322 Total: 3 zone(s) Current and Previously Abandoned Zones Page 1 of 3Date Run: 11/15/2018 Doc [#401782815] Well Name: CARMA 41-36 *ATTACH JOB SUMMARY Technical Detail/Comments: 5/14/2019Expiration Date: NoYesFlowline/Pipeline has been abandoned per Rule 1105 Type of Cement and Additives Used: *Cementing Contractor: *Wireline Contractor: Plugging Date:inch casingft. of Additional Plugging Information for Subsequent Report Only Casing Recovered: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged:CASING Plug Tagged: (Cast Iron Cement Retainer Depth) CICR Depth CICR Depth CICR Depth sacks cmt on top.withCIBP #5: Depth sacks cmt on top.80 with 25sacks cmt on top. CIPB #4: Depth2with4000CIBP #3: Depth Set sacks in mouse holeSetsacks in rat hole NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate 25Set sacks at surface ft.750ft. to940sacks half in. half out surface casing fromSet60 sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. 6800ft. to7150sks cmt from25Set sacks cmt on top.7150 with 25sacks cmt on top. CIPB #2: Depth5with7830CIBP #1: Depth Plug Type: NOTE: Two(2) sacks cement required on all CIBPs. Plugging Procedure for Intent and Subsequent Report McCoy, Diane Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable orders and is hereby approved. COGCC Approved:Date:11/15/2018 I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed:Print Name:CHERYL LIGHT Title:Staff Regulatory Analyst Date:10/3/2018 Email:DJREGULATORY@ANADARKO.COM CONDITIONS OF APPROVAL, IF ANY: Page 2 of 3Date Run: 11/15/2018 Doc [#401782815] Well Name: CARMA 41-36 COA Type Description 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon on-location flowlines per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44. 3) Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. 4) If there is pressure or evidence of gas migration after placing the CIBP at 4000’, contact COGCC engineering for an update to the plugging procedure Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure. Attachment Check List Att Doc Num Name 401782815 WELL ABANDONMENT REPORT (INTENT) 401783505 PROPOSED PLUGGING PROCEDURE 401783507 WELLBORE DIAGRAM 401840917 FORM 6 INTENT SUBMITTED Total Attach: 4 Files User Group Comment Comment Date Engineer Production records indicate this well has been SI since September 2016. All shut-in wells must pass a mechanical integrity test or be plugged and abandoned within two years of the initial shut-in date, this form 6 intent does not extend that due date. This well is overdue for MIT or PA. DWR’s aquifer determination tool base of Laramie-Fox Hills = 111' Deepest water well within one mile = 150’ Increased sacks of cement on CIBP #1 to cover stage tool. 11/15/2018 Permit Passed permit review 10/10/2018 Well File Verification Pass 10/10/2018 Total: 3 comment(s) General Comments Page 3 of 3Date Run: 11/15/2018 Doc [#401782815] Well Name: CARMA 41-36 THE PLUG & ABANDONMENT PROCESS When a well is no longer economically producing oil and natural gas, the well is evaluated for retirement and will undergo a process called ‘plug and abandonment,' or P&A as it is often called. To retire, or P&A, a well, the operator must submit a plug and abandonment plan to the state regulatory authority, the Colorado Oil and Gas Conservation Commission (COGCC) for approval. Once the plan is approved by the COGCC, the operator is required to inform the municipality where the well is located. Operators also communicate with surface land and mineral owners and surrounding neighbors regarding the retirement of the well. A workover rig arrives on-site. While the rig is on location, the well will be plugged per the plan approved by the COGCC. Cement is pumped into the well to cover and isolate the zones that produce oil and natural gas. 1 2 When the plugging operation is complete, the workover rig moves o the location, the well head is removed and the associated flowlines are excavated. Associated surface equipment (tanks, separators, etc.) may also be removed if it is not serving other active wells in the area. 3 The remaining portion of the well is cut a minimum of seven feet below the surface and an identifying marker is welded to the top of the plugged wellbore. 4 A final report is submitted to the COGCC to certify the wellbore has been plugged in accordance with the regulatory requirements. 5 The site is reclaimed, or restored, to match the existing landscape. Colorado Response Line: 1-866-248-9577 | anadarkocolorado@anadarko.com How a A Well is Retired