Loading...
HomeMy WebLinkAboutCHENG 3-8A - Well Abandonment Report - Kerr McGee - 11/9/2023Casing History Subsequent Report of Abandonment Details: If yes, explain details below If yes, explain details below Yes NoWellbore has Uncemented Casing leaks: NoYesFish in Hole: 1390Estimated Depth:NoYesCasing to be pulled: Other Mechanical ProblemsProduction Sub-economicDryReason for Abandonment: -104.91795040.156380 Longitude: GPS Data: Only Complete the Following Background Information for Intent to Abandon 1.9 07/20/2006GPS Quality Value:Date of Measurement: Latitude: Type of GPS Quality Value:PDOP 90750Field Number:Field Name:WATTENBERG Federal, Indian or State Lease Number: Meridian:667W Range:Township:2N 8 Section:QtrQtr: 3-8A Well Number: SENW County:WELD Location: CHENGWell Name: 05-123-20611-00API Number This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed configuration with plugs set. A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run during abandonment. State of Colorado Energy & Carbon Management Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 WELL ABANDONMENT REPORT FORM 6 Rev 11/20 Notice of Intent to Abandon Lindsay_Davis@oxy.comEmail: Fax: (970) 515-1616Phone: Zip:80217- 3779 COState:DENVER P O BOX 173779 Contact Name: City: Lindsay Davis Address: KERR MCGEE OIL & GAS ONSHORE LP Name of Operator: 47120OGCC Operator Number: robbie.revas@state.co.usEmail: Tel:(720) 661-7242Name:Revas, Robbie For "Intent" 24 hour notice required, COGCC contact: 10/24/2023 Date Received: Document Number: DE ET OE ES 403570770 Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth CODELL 7574 7596 NIOBRARA 7320 7434 J SAND 8002 8050 01/03/2012 SAND PLUG 7750 Total: 3 zone(s) Current and Previously Abandoned Zones Type of Well Abandonment Report: Page 1 of 5Date Run: 11/6/2023 Doc [#403570770] Well Name: CHENG 3-8A Technical Detail/Comments: NoYesFlowline/Pipeline has been abandoned per Rule 1105 Type of Cement and Additives Used: *Cementing Contractor: *Wireline Contractor: Cut and Cap Date: inch casingft. of Additional Plugging Information for Subsequent Report Only Casing Recovered: Plug Tagged:STUB PLUGPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASING Plug Tagged: (Cast Iron Cement Retainer Depth) CICR Depth CICR Depth4202 CICR Depth7290 sacks cmt on top.withCIBP #5: Depth sacks cmt on top.withsacks cmt on top. CIBP #4: DepthwithCIBP #3: Depth Set sacks in mouse holeSetsacks in rat hole NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate 80Set sacks at surface ft.492ft. to1390sacks half in. half out surface casing fromSet360 sacks. Leave at least 100 ft. in casing75ft. with2800Perforate and squeeze at sacks. Leave at least 100 ft. in casing95ft. with4232Perforate and squeeze at sacks. Leave at least 100 ft. in casing95ft. withPerforate and squeeze at 7320 ft. 492ft. to1390sks cmt fromSet360 ft. 1500ft. to1660sks cmt fromSet15 ft. 2490ft. to2800sks cmt fromSet25 ft. 4140ft. to4202sks cmt fromSet5 ft. 7230ft. to7290sks cmt from5Set sacks cmt on top.260 with 80sacks cmt on top. CIBP #2: Depth2with7650CIBP #1: Depth Plug Type: NOTE: Two(2) sacks cement required on all CIBPs. Plugging Procedure for Intent and Subsequent Report Casing Type Size of Hole Size of Casing Grade Wt/Ft Csg/Liner Top Setting Depth Sacks Cmt Cmt Btm Cmt Top Status SURF 12+1/4 8+5/8 J-55 24 0 542 380 542 0 VISU 1ST 7+7/8 4+1/2 L-80 11.6 0 8167 275 8167 6510 CBL 7+7/8 4+1/2 L-80 Stage Tool 0 5173 275 5240 4080 CBL Surface Plug Setting Date: Number of Days from Setting Surface Plug to Capping or Sealing the Well: Page 2 of 5Date Run: 11/6/2023 Doc [#403570770] Well Name: CHENG 3-8A 5/1/2024Expiration Date: Perforate and squeeze at 2300 ft. with 210 sacks. Leave at least 100 ft. in casing 1660 CICR Depth (Cast Iron Cement Retainer) BMPs Signage for P&As: Prior to commencing operations, KMG will post signs in conspicuous locations. The signs will indicate plugging and abandonment operations are being conducted, the well name, well, and the Operator’s contact information. Signs will be placed so as not to create a potential traffic hazard. Notifications: Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about out plugging and abandonment operations and providing contact information for Kerr McGee's response line and online resources. Wellbore Pressure: In some cases, wellbore pressure drawdown operations may occur approximately 1-2 days prior to Move In Rig Up (MIRU) of the workover rig. This is conducted to allow for reduced time that the workover rig is needed on location. These operations will be conducted in accordance with Form 4 and/or Form 6 requirements. Water: Water will be placed on dirt access roads to mitigate dust as needed. Lighting: Operations are daylight-only; no lighting impacts are anticipated from operations. Noise: Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. Environmental Concerns: This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & ECMC data) as well as internal wildlife datasets and aerial imagery. All field personnel are trained to identify wildlife risks and raise concerns noticed during operations with the KMOG Health, Safety, and Environment (HSE) department. COA Type Description Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line. Haverkamp, Curtis Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable orders and is hereby approved. COGCC Approved:Date:11/2/2023 I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed:Print Name:Lindsay Davis Title:Regulatory Tech Date:10/24/2023 Email:Lindsay_Davis@oxy.com CONDITIONS OF APPROVAL, IF ANY: Page 3 of 5Date Run: 11/6/2023 Doc [#403570770] Well Name: CHENG 3-8A 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) After placing plug at 2300’ assure that all fluid migration has been eliminated by monitoring the well for a minimum of 8 hours before proceeding to the next plug. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact ECMC engineering before continuing operations. 3) Prior to placing cement above the base of the Upper Pierre (approximately 1390’): verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 4) If surface casing shoe plug is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 492’ or shallower and provide a minimum of 10 sx plug at the surface. 5) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 6) After cut and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 7) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed. Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. If there is a need for sampling, contact ECMC engineering for verification of plugging procedure. Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment. Due to the proximity of residential building units (RBUs) all blowdown gasses will be controlled. COAs provided by Operator on the Submit Tab: Signage for P&As: Prior to commencing operations, KMG will post signs in conspicuous locations. The signs will indicate plugging and abandonment operations are being conducted, the well name, well, and the Operator’s contact information. Signs will be placed so as not to create a potential traffic hazard. Notifications: Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about out plugging and abandonment operations and providing contact information for Kerr McGee's response line and online resources. Noise: Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. 5 COAs Page 4 of 5Date Run: 11/6/2023 Doc [#403570770] Well Name: CHENG 3-8A Attachment List Att Doc Num Name 403570770 WELL ABANDONMENT REPORT (INTENT) 403570801 PROPOSED PLUGGING PROCEDURE 403570803 WELLBORE DIAGRAM 403581758 FORM 6 INTENT SUBMITTED Total Attach: 4 Files User Group Comment Comment Date Engineer DWR base of Fox Hills: 293' Deepest water well within 1 mile: 260' Base of Upper Pierre estimated: 1390' Bradenhead history: 43 psig Samples indicate thermogenic gas. 11/02/2023 OGLA OGLA review is complete.10/30/2023 Permit Per operator concurrence corrected top perf for Codell under Zone tab - typo Verified completed intervals - 378168, 400249431 pass 10/25/2023 Permit selected PDOP from dropdown box Verified as drilled lat/long Emailed operator due to discrepancy in Codell top perf Verified production reporting 10/24/2023 Total: 4 comment(s) General Comments Page 5 of 5Date Run: 11/6/2023 Doc [#403570770] Well Name: CHENG 3-8A