HomeMy WebLinkAboutCOORS V 6-14JI - Well Abandonment Report - Kerr McGee - 7/10/2018Status
VISU0571SURF 12+1/4 8+5/8 24 571 400
CBL6,6307,5071ST 7+7/8 3+1/2 7.7 7,507 154
CBL3,6005,710S.C. 1.1 7,507 625
CBL7,3257,9121ST LINER 2+7/8 2+3/8 4.7 7,912 5
Casing Type Size of Hole Size of Casing Weight Per Foot Setting Depth Sacks Cement Cement TopCement Bot
Casing History
Subsequent Report of Abandonment
Details:
If yes, explain details below
If yes, explain details below
Yes NoWellbore has Uncemented Casing leaks:
NoYesFish in Hole:
865Estimated Depth:NoYesCasing to be pulled:
Other
Mechanical ProblemsProduction Sub-economicDryReason for Abandonment:
-104.93532040.162430 Longitude:
GPS Data:
Only Complete the Following Background Information for Intent to Abandon
Paul Tappy1.605/16/2007 GPS Instrument Operator's Name:PDOP Reading:Date of Measurement:
Latitude:
90750Field Number:Field Name:WATTENBERG
Federal, Indian or State Lease Number:
Meridian:667W Range:Township:2N 6 Section:QtrQtr:
6-14Ji Well Number:
SESW
County:WELD
Location:
COORS VWell Name:
05-123-17324-00API Number
This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this
form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval
date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration
and the proposed configuration with plugs set.
A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore
diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and
cementing (third party verification) and any logs that may have been run during abandonment.
State of Colorado
Oil and Gas Conservation Commission
1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109
WELL ABANDONMENT REPORT
FORM
6
Rev
05/18
Notice of Intent to Abandon
cheryl.light@anadarko.comEmail:
(720) 929-7461Fax:
(720) 929-6461Phone:
Zip:80217-
3779
COState:DENVER
P O BOX 173779
Contact Name:
City:
CHERYL LIGHT
Address:
KERR MCGEE OIL & GAS ONSHORE LPName of Operator:
47120OGCC Operator Number:
tom.beardslee@state.co.usEmail:
Tel:(970) 420-3935Name:Beardslee, Tom For "Intent" 24 hour notice required,
COGCC contact:
07/10/2018
Date Received:
Document Number:
DE ET OE ES
401697095
Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth
CODELL 7326 7343
J SAND 7755 7794
Total: 2 zone(s)
Current and Previously Abandoned Zones
Page 1 of 3Date Run: 8/1/2018 Doc [#401697095] Well Name: COORS V 6-14Ji
*ATTACH JOB SUMMARY
Technical Detail/Comments:
1/31/2019Expiration Date:
NoYesFlowline/Pipeline has been abandoned per Rule 1105
Type of Cement and Additives Used:
*Cementing Contractor: *Wireline Contractor:
Plugging Date:inch casingft.
of
Additional Plugging Information for Subsequent Report Only
Casing Recovered:
Plug Tagged: Plug Type:
Plug Tagged: Plug Type:
Plug Tagged: Plug Type:
Plug Tagged: Plug Type:
Plug Tagged:CASING
Plug Tagged:
(Cast Iron Cement Retainer Depth)
CICR Depth
CICR Depth
CICR Depth
sacks cmt on top.withCIBP #5: Depth
sacks cmt on top.80 with 25sacks cmt on top. CIPB #4: Depth2with3970CIBP #3: Depth
Set sacks in mouse holeSetsacks in rat hole
NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate
25Set sacks at surface
ft.521ft. to965sacks half in. half out surface casing fromSet190
sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at
sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at
sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at
ft. ft. tosks cmt fromSet
ft. ft. tosks cmt fromSet
ft. ft. tosks cmt fromSet
ft. ft. tosks cmt fromSet
ft. 6660ft. to7260sks cmt from25Set
sacks cmt on top.7260 with 25sacks cmt on top. CIPB #2: Depth1with7690CIBP #1: Depth
Plug Type:
NOTE: Two(2) sacks cement
required on all CIBPs.
Plugging Procedure for Intent and Subsequent Report
McCoy, Diane
Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable
orders and is hereby approved.
COGCC Approved:Date:8/1/2018
I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete.
Signed:Print Name:CHERYL LIGHT
Title:Staff Regulatory Analyst Date:7/10/2018 Email:DJREGULATORY@ANADARKO.COM
CONDITIONS OF APPROVAL, IF ANY:
Page 2 of 3Date Run: 8/1/2018 Doc [#401697095] Well Name: COORS V 6-14Ji
COA Type Description
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon on-location flowlines per Rule 1105. File electronic Form 42 once
abandonment complete. Within 30 days of an operator completing abandonment
requirements for an off-location flowline or crude oil transfer line the operator must
submit a Flowline Report, Form 44.
3) Operator shall implement measures to control unnecessary and excessive venting, to
protect the health and safety of the public, and to ensure that vapors and odors from
well plugging operations do not constitute a nuisance or hazard to public welfare.
4) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment.
5) Production casing stub plug is also surface casing shoe plug, this plug must be
tagged at 521’ or shallower.
Prior to starting plugging operations a bradenhead test shall be performed if there has
not been a reported bradenhead test within the 60 days immediately preceding the start
of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25
psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during
the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with
Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are
collected, copies of all final laboratory analytical results shall be provided to the COGCC
within three (3) months of collecting the samples.
If there is a need for sampling, contact COGCC engineering for verification of plugging
procedure.
Attachment Check List
Att Doc Num Name
401697095 WELL ABANDONMENT REPORT (INTENT)
401697701 PROPOSED PLUGGING PROCEDURE
401697702 WELLBORE DIAGRAM
401720949 FORM 6 INTENT SUBMITTED
Total Attach: 4 Files
User Group Comment Comment Date
Well File
Verification
Well file not found for verification - pass task 06/01/17 07/12/2018
Total: 1 comment(s)
General Comments
Page 3 of 3Date Run: 8/1/2018 Doc [#401697095] Well Name: COORS V 6-14Ji