Loading...
HomeMy WebLinkAboutDREW GU TRUE 1 - Well Abandonment Report - Kerr McGee - 6/25/2019Status VISU0866SURF 12+1/4 9+5/8 36 866 475 CALC1,5008,1501ST 7+7/8 4+1/2 10.5/11.6 8,150 1,270 Casing Type Size of Hole Size of Casing Weight Per Foot Setting Depth Sacks Cement Cement TopCement Bot Casing History Subsequent Report of Abandonment Details: If yes, explain details below If yes, explain details below Yes NoWellbore has Uncemented Casing leaks: NoYesFish in Hole: 1000Estimated Depth:NoYesCasing to be pulled: Other Mechanical ProblemsProduction Sub-economicDryReason for Abandonment: -104.92906140.134533 Longitude: GPS Data: Only Complete the Following Background Information for Intent to Abandon Cody Mattson2.302/05/2009 GPS Instrument Operator's Name:PDOP Reading:Date of Measurement: Latitude: 90750Field Number:Field Name:WATTENBERG Federal, Indian or State Lease Number: Meridian:667W Range:Township:2N 18Section:QtrQtr: 1 Well Number: SWSE County:WELD Location: DREW GAS UNIT TRUEWell Name: 05-123-11551-00API Number This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed configuration with plugs set. A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run during abandonment. State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 WELL ABANDONMENT REPORT FORM 6 Rev 05/18 Notice of Intent to Abandon cheryl.light@anadarko.comEmail: (720) 929-7461Fax: (720) 929-6461Phone: Zip:80217- 3779 COState:DENVER P O BOX 173779 Contact Name: City: CHERYL LIGHT Address: KERR MCGEE OIL & GAS ONSHORE LPName of Operator: 47120OGCC Operator Number: randy.silver@state.co.usEmail: Tel:(720) 827-6688Name:Silver, Randy For "Intent" 24 hour notice required, COGCC contact: 06/25/2019 Date Received: Document Number: DE ET OE ES 402086603 Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth J SAND 7958 8022 Total: 1 zone(s) Current and Previously Abandoned Zones Page 1 of 3Date Run: 7/8/2019 Doc [#402086603] Well Name: DREW GAS UNIT TRUE 1 *ATTACH JOB SUMMARY Technical Detail/Comments: 1/7/2020Expiration Date: NoYesFlowline/Pipeline has been abandoned per Rule 1105 Type of Cement and Additives Used: *Cementing Contractor: *Wireline Contractor: Plugging Date:inch casingft. of Additional Plugging Information for Subsequent Report Only Casing Recovered: Plug Tagged: Plug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASING Plug Tagged: (Cast Iron Cement Retainer Depth) CICR Depth CICR Depth CICR Depth sacks cmt on top.withCIBP #5: Depth sacks cmt on top.withsacks cmt on top. CIPB #4: DepthwithCIBP #3: Depth Set sacks in mouse holeSetsacks in rat hole NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate 60Set sacks at surface ft.816ft. to1100sacks half in. half out surface casing fromSet125 sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at ft. ft. tosks cmt fromSet ft. 0ft. to150sks cmt fromSet60 ft. 2400ft. to2500sks cmt fromSet10 ft. 4030ft. to4130sks cmt fromSet10 ft. 6800ft. to7200sks cmt from25Set sacks cmt on top.7200 with 25sacks cmt on top. CIPB #2: Depth2with7900CIBP #1: Depth Plug Type: NOTE: Two(2) sacks cement required on all CIBPs. Plugging Procedure for Intent and Subsequent Report Jacobson, Eric Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable orders and is hereby approved. COGCC Approved:Date:7/8/2019 I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed:Print Name:CHERYL LIGHT Title:Staff Regulatory Analyst Date:6/25/2019 Email:DJREGULATORY@ANADARKO.COM CONDITIONS OF APPROVAL, IF ANY: Page 2 of 3Date Run: 7/8/2019 Doc [#402086603] Well Name: DREW GAS UNIT TRUE 1 COA Type Description No CBL on file. CBL to be run prior to plugging to verify existing cement coverage - submit to COGCC for verification of plugging orders. If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations, a Bradenhead test shall be performed. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required, and the COGCC engineering staff must be contacted. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. 3) If sampling is required contact COGCC engineering for a confirmation of plugging requirements prior to placing any plugs. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test. 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Prior to placing the 1100' plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 816' or shallower and provide 10 sack plug at surface. 4) Leave at least 100’ of cement in the wellbore for each plug. 5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. Attachment Check List Att Doc Num Name 402086603 WELL ABANDONMENT REPORT (INTENT) 402087024 PROPOSED PLUGGING PROCEDURE 402087025 WELLBORE DIAGRAM 402097969 FORM 6 INTENT SUBMITTED Total Attach: 4 Files User Group Comment Comment Date Engineer Deepest Water Well within 1 Mile – 532' SB5 Base of Fox Hills - 391' 07/08/2019 Well File Verification Pass 06/28/2019 Permit Verified as drilled lat/long Verified completed interval (84229) Verified production reporting 06/25/2019 Total: 3 comment(s) General Comments Page 3 of 3Date Run: 7/8/2019 Doc [#402086603] Well Name: DREW GAS UNIT TRUE 1