Loading...
HomeMy WebLinkAbout 16-29 Approving Bluestem Tech FDPRESOLUTION NO. 16-2.M A RESOLUTION APPROVING A FINAL DEVELOPMENT PLAN FOR BLUESTEM TECH CENTER WHEREAS, there has been submitted to the Board of Trustees a request for approval of a final development plan for Bluestein Tech Center; and WHEREAS, all materials related to this application have been reviewed by Town Staff and found with conditions to be in compliance with Town of Firestone subdivision and zoning ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and WHEREAS, the Firestone Planning and Zoning Commission held a properly noticed public hearing on the application, and has forwarded to the Board of Trustees a recommendation of approval with conditions; and WHEREAS, after aduly-noticed public hearing, at which evidence and testimony were entered into the record, the Board of Trustees finds the final development plan should be approved subject to certain conditions. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. The final development plan for Bluestem Tech Center is hereby approved, subject to the conditions set forth on Exhibit A attached hereto and incorporated herein by reference. PASSED AND ADOPTED this 28th day of September, 2016. a Medina, Town Clerk 1 EXHIBIT A Final Development Plan, Bluestem Tech Center Conditions of Approval 1. Address Town Engineer comments memo dated September 13, 2016, attached hereto as Exhibit A-1. 2. Address Town Planner comments in email dated September 14, 2016, attached hereto as Exhibit A-2, 3. Revise the FDP to note that proposed parking complies with ADA requirements. 920{2016 1:50 Piv[ [knk] R:�FirestoneVSubdivisions�i3luestem Tech FDP.T6 res.docx G EXHIBIT 4A-1 Town Engineer Comments Memo dated September 13, 2016 �t�L(�FtApU CIVIL GitiJUP, iN� fOp^MfVZ€osu n'a TO: Mr. Bruce Nickerson, The Nickerson Company, Town Planner FROM: Dave Lindsay, Colorado Civil Group, Inc., Town Engineer t Amber Messersmith, Colorado Civil Group, Inc., Town Engineer DATE: SUBJECT: I�Z�aIX��C•a September 13, 2016 Bluestem Tech Center 0668.0421.00 I = 1 We have completed our review of the Bluestem Tech Center Final Development Plan that was received on August 17, 2016 and offer the following comments: General: 1. The Town will need to prepare recording instructions/order for this application. 2. The water easement agreement will need to be executed prior to recording the FDP 3. The water easement agreement reception number will need to be filled in on Sheet 7-Utility Plan prior to recording the FDP. Submittal Binder: 4. Title Commitment (10.3.5) —The Title Policy lists the owner as Bluestem Tech Center, LLC a Colorado Limited Liability Company dated of June 27, 2016. An updated Title Commitment is required prior to recording, dated no later than one month prior to the application date. 5. Water Dedication (10.3.10) — We have reviewed the information submitted for the water dedication. We recommend the Applicant call us to discuss this item. DOMESTIC DEMAND -The Applicant provided actual water bills from a building in Longmont. The annual usage per building square of the Longmont building is 3.8 gallons per year per building square foot. This usage seems low to us (the average commercial 3 office usage in Firestone is 38 gallons per year per building square foot). The Domestic Demand is calculated to be 2.5 CBT shares (based on 38 gallons/year/building square footage * 12,480 building square footage). IRRIGATION DEMAND —The irrigation demand is calculated to be 0.43 CBT shares (based on the landscape area of 0.172 acres). The water shares for the existing landscaping located along the north edge of the property were previously dedicated. TOTAL CBT SHARES —The Total CBT water shares is 3 CBT shares. 6. Water Service Calculations (10.3.11) —Revised water service sizing calculations were submitted using the [PC. The flow rate was compared to AWWA Table 6-1. A 1-inch water meter and tap is acceptable. The water service sizing calculations do not need to be re -submitted. Final Drainage Report (FDR): 7. The Final Drainage Summary for the Bluestem Tech Center prepared by Benchmark Engineers dated July 1, 2016 was reviewed and approved. 8. Two (2) original stamped hardcopy Final Drainage Reports will need to be submitted with the final Mylars. Final Development Plan (FDPZ 9. Sheet 1 (Project Concept) —The uses listed in the Project Concept section of the FDP have been made consistent with the water dedication calculations. 10. Sheet 1 (10.5.16 Water Dedication) —The water dedication language is correct. 11. We have no further engineering comments. These comments are provided to assist the applicant in preparation of the FDP We will forward these comments to the applicant's engineer. Let us know if there is anything else that we can help you with. 0 EXHIBIT A-2 Town Planner Comments, email dated September 14, 2016 1J "LL��� DATE September 14, 2016 TO John D'Amico FROM Bruce Nickerson, Town Planner SUBJECT Bluestem Tech Center Final Development Plan CC Town Staff For your reference, we have reviewed the proposed resubmittal of the Final Development Plan ("FDP") dated August 18, 2016 along with associated documents for the Bluestem Tech Center application and have the following comments. FDP 1. Modify plans pursuant to comments from the Town Engineer. 2. In the Project Concept section note that restaurants are permitted, provided the necessary water to operate them is dedicated to the Town. Please contact us if you have any questions regarding these comments. 5