Loading...
HomeMy WebLinkAbout22-136 Change Order No. 4 Northern Colorado Constructors Historic Waterlines Replacement Project No. 1 12-14-2022RESOLUTION NO.22-136 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING CHANGE ORDER NO.4 TO THE CONSTRUCTION CONTRACT BETWEEN THE TOWN OF FIRESTONE AND NORTHERN COLORADO CONSTRUCTORS FOR CONSTRUCTION WORK PERTAINING TO THE HISTORIC FIRESTONE WATERLINES REPLACEMENT PROJECT NO. 1 WHEREAS, by Resolution No. 22-136, the Town of Firestone ("Town") entered into an agreement with Northern Colorado Constructors ("NCC") for construction services for the Historic Firestone Waterlines Replacement Project No. I (the "Project"); and WHEREAS, the Town administratively approved Change Order No. 1 to the agreement, which authorized NCC to repair an existing leak on existing waterline; and WHEREAS, the Town administratively approved Change Order No. 2 to the agreement, which further authorized to remove and replace damaged water meter pits; and WHEREAS, the Town administratively approved Change Order No. 3 to the agreement, which authorized an adjustment to the agreement's performance deadlines; and WHEREAS, during the course of performing the work authorized under the agreement, there were several changes directed by the Owner or Project Engineer all of which were necessary for the successful completion of the Project; and WHEREAS, these changes, included, for example, additional subgrade remediation and stabilization for proper road base, concrete, and asphalt installation in connection with a portion of Jackson Drive, and additional asphalt milling due to availability of hauling services that were originally intended to be provided by the Town. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Change Order No. 4 to the Construction Contract between the Town of Firestone and Northern Colorado Constructors for the Historic Firestone Water Lines Replacement Project No. I is approved in substantially the same form as the copy attached hereto and made a part of this resolution. The Mayor is authorized to execute the Change Order on behalf of the Town. INTRODUCED, READ AND ADOPTED this day ofDCUnW ,, 2022. ATT T: Monzalez, Deputy Town Clerk t APP_--' William ayaswn Attorney SEAL TOVjR�,bF �FIFYJKO�NECOLORADO Drew Alan Peterson, Mayor CHANGE ORDER No. 4 Date of Issuance: 12108/2022 Effective Date: 12/08/2022 fact Documents are modified as fOnows u Oil ewcwuw ... ••••" " ._.. _ __ __-- in: Subgrade Remediation: Poor subgrade conditions were encountered on a portion of Jackson Drive, requiring additional work by the to remediate and stabilize for proper road base, concrete, and asphalt Installation. Asphalt Millings Hauling: The Contractor had provided additional asphalt milling during construction due to availability of hauling services that were originally Intended to be provided by the Town of Firestone as indicated in the project specifications. Attachments (list documents supporting change): WCD for Subgrade Remediation and Associated Documentation NCC Asphalt Millin Chan a Request Documentation CHANGE IN CONTRACT TIMES: CHANGE IN CONTRACT PRICE: Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days Substantial completion (days or date): 11/30/2022 Ready for fiinalpayment (days or date): 12/30/2022 $1.337 158.50 [Increase] from previously approved Change Orders No. [Increase] from previously approved Change Orders 1 to No 3: No. 1 to No. 3: Substantial completion (days): 0 Days (Milestone 1)151 (Milestone 2) Ready for final payment (days): 0 Days (Milestone1)181 (Milestone 2) $6.249.80 Contract Price prior to this Change Order: Contract Times prior to this Change Order. Substantial completion (days or date): 11/30/2022 (Milestone 1) 4/30/2023 (Milestone 21 Ready for final payment (days or date): 12/30/2022 (Milestone 1) 5/30/2023 (Milestone 2) $1.343 408.30 [Increase] of this Change Order. [Increase] of this Change Order: Substantial completion (days or date): 0 Days 34 676.02 Ready for final payment (days or date): 0 Days Contract Price Incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion (days or date): 11/30/2022 (Milestone 11 4130/2023 (Milestone 2) Ready for final payment (days or date): 12/30/2022 (Milestone 1) 5/30/2023 (Milestone 2) $1 378.084.32 RECO NDED: ACC ACCEPTED: By: By: By. gmeering ( (Au Authorized Signature) Owner thorized Signature) Contractor (Authorized Signature) Date: 12/14/2022 Date: 1?`11`{1;0rL Date: 12/14/22