HomeMy WebLinkAbout23-24 Approving change Order No.1 Design & Construction American Ramp Company Mountain Shadows Pump Track & Bike Park 2-08-2023RESOLUTION NO.23-24 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING CHANGE ORDER NO 1 TO DESIGN AND CONSTRUCTION CONTRACT BETWEEN THE TOWN OF FIRESTONE AND AMERICAN RAMP COMPANY FOR THE DESIGN AND CONSTRUCTION OF MOUNTAIN SHADOWS PUMP TRACK AND BIKE PARK WHEREAS, on May 25, 2022, the Town of Firestone ("Town") and American Ramp Company ("Contractor") entered into a Design and Construction contract for Mountain Shadows Pump Track and Bike Park; and WHEREAS, as Town staff and Contractor were collaborating during the design and planning process to specify the design and precise scope of the pump track and bike park project, Town staff identified and assessed a design change that would add technical elements and features for the mountain bike skills course, improving upon the overall quality and attractiveness of the project and, in turn, helping to build a healthier and happier community; and WHEREAS, additional budgeted funds would be needed for the potential expansion in the design and scope of the project, requiring a change order to reflect the change in project scope and budget; and WHEREAS, in addition to staff determining that American Ramp Company has the expertise and experience to perform the work, American Ramp Company is an approved Sourcewell contractor which is a national organization which provides public entities including agencies of the State of Colorado with competitively approved contractors; and WHEREAS, staff recommends, with the support of Contractor and the project's design team, approval of the recommended design and scope and change to project budget. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Change Order No. 1 to the Design and Construction Contract between the Town of Firestone and American Ramp, is approved in substantially the same form as the copy attached hereto and made a part of this resolution, and the Mayor is authorized to execute Change Order No. 1 on behalf of the Town. INTRODUCED, READ AND ADOPTED this 8ch day of February, 2023. Drew Alan Peterson, ATT Kri4f K. Bashor, CM own Clerk` APPROVE S O William P.TIayas7u,fo ttorney CHANGE ORDER NO. 1 DATED: January 25th, 2023 TO: American Ramp Company PROJECT: Mountain Shadows Pump Track & Dirt Bike Park PROJECT NUMBER: OWNER: Town of Firestone You are hereby requested to comply with the following changes from the Agreement. DESCRIPTION OF CHANGES DECREASE INCREASE We are adding Phase 2 to the Mtn. Contract Price Contract Price Shadows Pump Track Project. From $248,931.35 2022. Phase 2 will add the Dirt Bike Park to the entire plan to be completed in 2023. TOTALS $248,931.35 NET CHANGE TO CONTRACT PRICE: Original Contract Price: $ 325,000.00 Current Contract Price adjusted by previous Change Order: $ 325,000.00 Amount of this Change Order $ 248,931.35 New Contract Price, including this Change Order, will be: $ 573,931.35 APPROVALS: Project Manager: Date: Consultant/Contractor: Date: Director: Date: CHG -1 **** NOTE -- EXHIBIT, WHICH DESCRIBES THE BIKE PARK CHANGE ORDER WORK TO BE PERFORMED SCOPE OF WORK (CHANGE ORDER SCOPE HIGHLIGHTED IN BLUEI TASK 3.0- CONSTRUCTION PHASE (BIKE PARK CHANGE ORDER) 3.1 INCLUDES*: • All labor, supplies, tools, materials, and equipment required per scope of work • Fabrication and installation of all Bike Park elements • All materials/labor required to construct rideable bike park components per design • Earthmoving techniques/compaction of jumps, features, trail work • As -built drawings • Payment/performance bonds 3.2 EXCLUDES*: • Fencing of any kind • Permitting or sales tax • Site testing and inspections: standard proctor/density testing, onsite concrete cylinders, engineering, surveying, or testing services. • Utility, mechanical, electrical, plumbing work, relocation or repairs of any kind. • Any landscaping • Toxic or hazardous material handling or removal. • Dewatering, silt fence, soil stabilization, erosion control, street cleaning, and traffic control. • Signage. • Any work not specifically indicated above. 3.3 CUSTOMER PROVIDES*: • Sufficient water and electrical power within 100 feet of work areas. • Unobstructed, safe, and continuous access to work area with heavy equipment. All weather roads for heavy equipment. • All necessary site information including topography, site surveying, and elevations. Task 3.0 Deliverables: • Fully constructed bike park and as -built drawings (highlighted in blue).