HomeMy WebLinkAbout23-28 Change Order No. 1 to Sun Valley Electric, Inc. Contract Alluvial Supply Treatment Horizontals Well Pump Stations 03-08-2023RESOLUTION NO.23-28
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE
COLORADO APPROVING CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN
THE TOWN OF FIRESTONE AND SUN VALLEY ELECTRIC INC FOR
CONSTRUCTION OF THE FIRESTONE ALLUVIAL SUPPLY TREATMENT
HORIZONTAL WELL PUMP STATION
WHEREAS, by Resolution No. 22-64 the Town of Firestone ("Town") entered into a
contract with Sun Valley Electric Inc. ("Sun Valley") to construct the Firestone Alluvial Supply
Treatment ("FAST") Horizontal Well Pump Station; and
WHEREAS, due to delays caused by the late delivery of supplies, weather and United
Power, Sun Valley requests that the contract time be extended to April 1, 2023; and
WHEREAS, though the St. Vrain Water Treatment Plant Injection Pump Station for which
Sun Valley served as electrician is complete, the Town desires to add certain improvements, which
include additional exterior lighting, an additional thermostat and access improvements to the
Injection Pump Station's facilities all of which can be done by Sun Valley; and
WHEREAS, the Injection Pump Station's Contractor has advised the Town that as it would
have to hire a subcontractor to construct the improvements it would be less expensive to have Sun
Valley perform the requested work and the cost effectiveness would be further increased by the
fact that the Injection Pump Station is on the same property as the FAST Horizontal Well Pump
Station.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
Change Order No. I to the FAST Horizonal Well Pump Station Contract between the
Town of Firestone and Sun Valley Electric Inc. is approved in substantially the same form as the
copy attached hereto and made a part of this resolution and the Mayor is authorized to execute
the Change Order on behalf of the Town.
INTRODUCED, READ ADOPTED this day of AAarCK 2023.
{P05 ow o�
TO l F NE,COLORADO
t0
SEAL I�
f� Drew Alan Peterson, Mayor
AT EST:
M' ' m Luna Gonzalez, Deputy Town Clerk
APPRO :
MOP
William P. Rayashi,l%fvn Attorney
SECTION 00941
CHANGE ORDER
No. 1
Date of Issuance: 01/1612023 Effective Date: 01/162023
Firestone FAST Pump Station ITown of Firestone
W2020-9531.02
NO.:
Sun Valley
The Contract Documents are modified as follows upon execution of this Chance Order:
Description:
Sun Valley is being issued a change in contract price for an increase in scope of work for additional electrical work at the Injection Well
Pump Station. Additional scope of work includes; Providing and installing exterior fighting at each mandoor with single pull switch, box, and
associated conduit, fittings and wiring ($2,840.00 for both lights), Providing and installing Crossover Stairs at the Containment Wall
($2,800), providing and installing exhaust fan thermostat including associated electrical conduit and wiring ($445.00), filling both 500bb1
tanks approximately 50% full to allow for testing ($1,640.00). Total change in price is $7,725. Sun Valley is also being issued a change in
time due to VFD delivery and building permit delays. Substantial completion is being moved to January 20' based on Sun Valley's
schedule with a Final Completion Date of February 314.
The Following Line Items are Added to the contract
PCO#1.1 -Provide and Install (2) New Exterior Lights $2,840.00
PCO#1.2 - Provide and Install Crossover Stairs at Containment $2,800.00
PCO#1.3 - Fill tanks 500bbi tank to approximately 50°/n to allow for testing (previously completed) $1.640.00
PCO#1.4 - Provide and Install Exhaust Fan Thermostat $445.00
Attachments (list documents supporting change):
Sun Valley Proposal #102722-01 Rev.01 (Engineer markup)
Sun Valley Proposal #102722-01 (Engineer markup)
Construction Schedule
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days
Substantial completion (days or date): August 15t' 2022
$420.450.00 Ready for final payment (days or date): August 31"2022
[Increase] {Bearease] from previously approved Change [Increase] [Decrease] from previously approved Change Orders
Orders No. 0 to No. 0: No. _ to No.
Substantial completion (days): Na
$0.00 Ready for final payment (days): n/a
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion (days or date): August 1 V 2022
$420.450.00 Ready for final payment (days or date): August 31"2022
[Increase] [Pecrease] of this Change Order: [Increase] [Desease] of this Change Order:
Substantial completion (days or date): March I r 2023
$7,725.00 Ready for final payment (days or date): April 1512023
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion (days or date): March 17" 2023
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
00941-1 of 2
$42 1175.00 Ready for final payment (days or date): April 1s 2023
Date: O�'�V ofLrt Date: dl��ao23
Approved by FundingAgency (if applicable):
Date: I/3D�Zd Z.3
Dale:
EJCDC C•941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
00941.2 of 2
y
.r
3
i
t
S
r
3
r'
fo
v
m
3
o a
w uu
W3
E
1'
5D
H
Fit
a
Im
H
0.
09
H
IE
f,
,
Inc.
Proposal # 102722-01 Rev.01
5475 Hwy 86 Unit #3
Elizabeth, CO 80107
Date:
Thursday, January 12, 2023
Office 303 646-6339 / Fax 303 646-6340
Eapneer:
N/A
"NlNBOC & SBE Certified"'
Electrical Eng:
NIA
Date of Plan:
N/A
Plan #
NIA
Colorado Civil Group
Job Name:
Misc. Electrical Changes in Pump Building
Attn: Dave Lindsay
Fill Tanks from Fire Hydrant
Location:
Firestone SWO Injection Well
Firestone, Co
SVEComact
Matt Weber
ctrical additions in pump building
water tanks from hydrant for testing
Provide and Install (2) new exterior lights
ride and Install (2) RAB WPLED26 exterior light fudures, one above each mandoor on pump building
and Install single poks switch and box at each location
and install conduit, fittings, and wiring
Provide and install Crossover stairs at Containment
vide and install Cofterman 5SPS24A7C1 P3 Aluminum Crossover bridge
vide and install concrete blocks for support point on containment exterior
Thor to containment interior floor
93- Fill both 500bbi tanks approximately 50% to allow for tasting fpnaviousy completed)
Extra labor required due to problems getting water to fire hydrant
Pick up and return hose
Rental- 300' of 2.5' hose for 2 days
Total tours-19
)ED: Anything not SPl ctgcally Montioned in this Proposal
Controls
We propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of:
Seven Thousand Two Hundred Eighty and 00/100 dollars]';_,"' S7•a280AD,.
Note: This proposal may be withdrawn by us
if not accepted within 30 days.
Accepted; The above prices. specifications and
conditions are salisfactory and are hereby accepted.
You are authorized to do the work as specified.
Payment will he made as outlined above.
Authorized
Signature .?Matt Weber
President
Signature
Sun Valley Electric, Ine,
5475 Hwy 86 Unit #3
Efvabeth. CO 80107
Office 303 646-63391 Fox 303 646-6340
*NWSOC & SSE CovVilieda
Colorado Civil Group
Attn: Dave Lindsay
Proposal# 102722-01
Darr.
Thursday, October 27, 2022
Engnwet
NIA
Hecmcal Fng:
N/A
Dalr of Plan.
NIA
Plan a
WA
Job Nam,
Misc- Electrical Changes in Pump Building
Fill Tanks from Fire Hydrant
Incanon
Firestone SWD Injection Well
Firestone. CO
SVE I'ontan
Matt Weber
Electricsl additions In pump building
Fill water tanks from hydrant for testing
et- Provide and Install (2) new extorlor lights $2,840.00
Provide and Install (2) RAS WPLED26 exterior light fixtures, one above each mandoor on pump building
Provide and Install single pole switch and box at each locelion
Provide and install conduit, goings, and wiring
02- Provide and install exhaust fan thermostat 3445.00
F" Piovide'and Install 120%, SPST thermostat, close on temperature rise
i I Intercept exhaust fan power conduit and extend down to swithch
III loth 500bbl tanks approximately 50%to allow for testing (previously completed) $1A40.00
labor required due to problems getting "let to fire hydrant
ip and return hose
n- 300' of 2.5' hose for 2 days
hours-19
)ED: Anything not Specifically Mentioned In this Proposal
Controls
me/Altedrours Work
of service equipment
�cal Acceptance Testing
Fees
yjo1.5°A)
We propose hereby to famish materiel and labor complete in wwrdanm witb above specification. for the sum of
Four Thousand Nine Hundred Twenty Five and 0011 dollars $4,925.00
Now This proposal may be withdrawn by us
if not accepted within 30 days.
Accepted. The abase prices. sprcdicanons and
mndinuns arc satisfactob and are thereby accepted
You are aulhoriud to do the work n specified.
Payincnl will be made es outliucd zbavc
Authorized
ssnalurr Watt Weber
Vice President
slgmildre