HomeMy WebLinkAbout23-28 Change Order No. 1 to Sun Valley Electric, Inc. Contract Alluvial Supply Treatment Horizontals Well Pump Stations 03-08-2023RESOLUTION NO.23-28 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE COLORADO APPROVING CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN THE TOWN OF FIRESTONE AND SUN VALLEY ELECTRIC INC FOR CONSTRUCTION OF THE FIRESTONE ALLUVIAL SUPPLY TREATMENT HORIZONTAL WELL PUMP STATION WHEREAS, by Resolution No. 22-64 the Town of Firestone ("Town") entered into a contract with Sun Valley Electric Inc. ("Sun Valley") to construct the Firestone Alluvial Supply Treatment ("FAST") Horizontal Well Pump Station; and WHEREAS, due to delays caused by the late delivery of supplies, weather and United Power, Sun Valley requests that the contract time be extended to April 1, 2023; and WHEREAS, though the St. Vrain Water Treatment Plant Injection Pump Station for which Sun Valley served as electrician is complete, the Town desires to add certain improvements, which include additional exterior lighting, an additional thermostat and access improvements to the Injection Pump Station's facilities all of which can be done by Sun Valley; and WHEREAS, the Injection Pump Station's Contractor has advised the Town that as it would have to hire a subcontractor to construct the improvements it would be less expensive to have Sun Valley perform the requested work and the cost effectiveness would be further increased by the fact that the Injection Pump Station is on the same property as the FAST Horizontal Well Pump Station. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Change Order No. I to the FAST Horizonal Well Pump Station Contract between the Town of Firestone and Sun Valley Electric Inc. is approved in substantially the same form as the copy attached hereto and made a part of this resolution and the Mayor is authorized to execute the Change Order on behalf of the Town. INTRODUCED, READ ADOPTED this day of AAarCK 2023. {P05 ow o� TO l F NE,COLORADO t0 SEAL I� f� Drew Alan Peterson, Mayor AT EST: M' ' m Luna Gonzalez, Deputy Town Clerk APPRO : MOP William P. Rayashi,l%fvn Attorney SECTION 00941 CHANGE ORDER No. 1 Date of Issuance: 01/1612023 Effective Date: 01/162023 Firestone FAST Pump Station ITown of Firestone W2020-9531.02 NO.: Sun Valley The Contract Documents are modified as follows upon execution of this Chance Order: Description: Sun Valley is being issued a change in contract price for an increase in scope of work for additional electrical work at the Injection Well Pump Station. Additional scope of work includes; Providing and installing exterior fighting at each mandoor with single pull switch, box, and associated conduit, fittings and wiring ($2,840.00 for both lights), Providing and installing Crossover Stairs at the Containment Wall ($2,800), providing and installing exhaust fan thermostat including associated electrical conduit and wiring ($445.00), filling both 500bb1 tanks approximately 50% full to allow for testing ($1,640.00). Total change in price is $7,725. Sun Valley is also being issued a change in time due to VFD delivery and building permit delays. Substantial completion is being moved to January 20' based on Sun Valley's schedule with a Final Completion Date of February 314. The Following Line Items are Added to the contract PCO#1.1 -Provide and Install (2) New Exterior Lights $2,840.00 PCO#1.2 - Provide and Install Crossover Stairs at Containment $2,800.00 PCO#1.3 - Fill tanks 500bbi tank to approximately 50°/n to allow for testing (previously completed) $1.640.00 PCO#1.4 - Provide and Install Exhaust Fan Thermostat $445.00 Attachments (list documents supporting change): Sun Valley Proposal #102722-01 Rev.01 (Engineer markup) Sun Valley Proposal #102722-01 (Engineer markup) Construction Schedule CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days Substantial completion (days or date): August 15t' 2022 $420.450.00 Ready for final payment (days or date): August 31"2022 [Increase] {Bearease] from previously approved Change [Increase] [Decrease] from previously approved Change Orders Orders No. 0 to No. 0: No. _ to No. Substantial completion (days): Na $0.00 Ready for final payment (days): n/a Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion (days or date): August 1 V 2022 $420.450.00 Ready for final payment (days or date): August 31"2022 [Increase] [Pecrease] of this Change Order: [Increase] [Desease] of this Change Order: Substantial completion (days or date): March I r 2023 $7,725.00 Ready for final payment (days or date): April 1512023 Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion (days or date): March 17" 2023 EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00941-1 of 2 $42 1175.00 Ready for final payment (days or date): April 1s 2023 Date: O�'�V ofLrt Date: dl��ao23 Approved by FundingAgency (if applicable): Date: I/3D�Zd Z.3 Dale: EJCDC C•941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00941.2 of 2 y .r 3 i t S r 3 r' fo v m 3 o a w uu W3 E 1' 5D H Fit a Im H 0. 09 H IE f, , Inc. Proposal # 102722-01 Rev.01 5475 Hwy 86 Unit #3 Elizabeth, CO 80107 Date: Thursday, January 12, 2023 Office 303 646-6339 / Fax 303 646-6340 Eapneer: N/A "NlNBOC & SBE Certified"' Electrical Eng: NIA Date of Plan: N/A Plan # NIA Colorado Civil Group Job Name: Misc. Electrical Changes in Pump Building Attn: Dave Lindsay Fill Tanks from Fire Hydrant Location: Firestone SWO Injection Well Firestone, Co SVEComact Matt Weber ctrical additions in pump building water tanks from hydrant for testing Provide and Install (2) new exterior lights ride and Install (2) RAB WPLED26 exterior light fudures, one above each mandoor on pump building and Install single poks switch and box at each location and install conduit, fittings, and wiring Provide and install Crossover stairs at Containment vide and install Cofterman 5SPS24A7C1 P3 Aluminum Crossover bridge vide and install concrete blocks for support point on containment exterior Thor to containment interior floor 93- Fill both 500bbi tanks approximately 50% to allow for tasting fpnaviousy completed) Extra labor required due to problems getting water to fire hydrant Pick up and return hose Rental- 300' of 2.5' hose for 2 days Total tours-19 )ED: Anything not SPl ctgcally Montioned in this Proposal Controls We propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: Seven Thousand Two Hundred Eighty and 00/100 dollars]';_,"' S7•a280AD,. Note: This proposal may be withdrawn by us if not accepted within 30 days. Accepted; The above prices. specifications and conditions are salisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will he made as outlined above. Authorized Signature .?Matt Weber President Signature Sun Valley Electric, Ine, 5475 Hwy 86 Unit #3 Efvabeth. CO 80107 Office 303 646-63391 Fox 303 646-6340 *NWSOC & SSE CovVilieda Colorado Civil Group Attn: Dave Lindsay Proposal# 102722-01 Darr. Thursday, October 27, 2022 Engnwet NIA Hecmcal Fng: N/A Dalr of Plan. NIA Plan a WA Job Nam, Misc- Electrical Changes in Pump Building Fill Tanks from Fire Hydrant Incanon Firestone SWD Injection Well Firestone. CO SVE I'ontan Matt Weber Electricsl additions In pump building Fill water tanks from hydrant for testing et- Provide and Install (2) new extorlor lights $2,840.00 Provide and Install (2) RAS WPLED26 exterior light fixtures, one above each mandoor on pump building Provide and Install single pole switch and box at each locelion Provide and install conduit, goings, and wiring 02- Provide and install exhaust fan thermostat 3445.00 F" Piovide'and Install 120%, SPST thermostat, close on temperature rise i I Intercept exhaust fan power conduit and extend down to swithch III loth 500bbl tanks approximately 50%to allow for testing (previously completed) $1A40.00 labor required due to problems getting "let to fire hydrant ip and return hose n- 300' of 2.5' hose for 2 days hours-19 )ED: Anything not Specifically Mentioned In this Proposal Controls me/Altedrours Work of service equipment �cal Acceptance Testing Fees yjo1.5°A) We propose hereby to famish materiel and labor complete in wwrdanm witb above specification. for the sum of Four Thousand Nine Hundred Twenty Five and 0011 dollars $4,925.00 Now This proposal may be withdrawn by us if not accepted within 30 days. Accepted. The abase prices. sprcdicanons and mndinuns arc satisfactob and are thereby accepted You are aulhoriud to do the work n specified. Payincnl will be made es outliucd zbavc Authorized ssnalurr Watt Weber Vice President slgmildre