Loading...
HomeMy WebLinkAboutTemporary Closure of Ronald Reagan Boulevard - 6/4/2021Temporary Closure of Ronald Reagan Boulevard Beginning at 7:00 a.m. on Monday, June 7, 2021, Ronald Reagan Boulevard (WCR 28) will be temporarily closed between WCR 9.5 and Colorado Boulevard for the installation of a water line for future phases of the Barefoot Lakes subdivision. The closure is anticipated to last for one week, and be open prior to Monday, June 14, 2021. Local traffic will be allowed on Ronald Reagan Boulevard between WCR 9.5 and Barefoot Lakes Parkway. Motorists are urged to pay close attention to traffic control signs, reduce speeds and, follow the marked detour routes on WCR 9.5, Highway 66, and Colorado Boulevard. Share on Facebook Share on Twitter Share via Email Copyright © 2021 Town of Firestone. All Rights Reserved. 151 Grant Ave. Firestone, CO 80520 Powered by