Loading...
22-83 Approving Change in Order No.2 Integrated Water Services Construction Pump Station St. Vrain Water Treatment Plant 07-13-2022EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00941 - 1 SECTION 00941 CHANGE ORDER No. 2 Date of Issuance: 2022.07.01 Effective Date: 2022.07.13 Project: St. Vrain WTP Pump Station Owner: Town of Firestone Owner's Contract No.: W2020-9524.02 Contract: St. Vrain WTP Pump Station Date of Contract: May 26, 2021 Contractor: Integrated Water Services Engineer's Project No.: 22704136 The Contract Documents are modified as follows upon execution of this Change Order: Description: The Contractor has incurred costs related to the additional work necessitated and listed below. These items are explained in greater detail in accordance with their respective attachment. (New) Item #PCO #1 - Foundation Preparation (New) Item #PCO #2 - EUSERV Panel (New) Item #PCO #4 - Generator Pad Size Increase (New) Item #PCO #5 - Conduit & Electrical Cable (New) Item #PCO #6 - Painting Exterior of Pump Station (New) Item #PCO #8 – Louver Resize Furthermore, an additional thirty (30) calendar days has been requested by the contractor to accommodate for the work above. However, the completion of this project is directly tied to the completion of the water treatment plant (WTP). Currently, the WTP schedule shows treated water should start production for delivery to the Finished Water Tank starting mid-August. The Substantial and Final Completion dates have been adjusted based on this timeline for this change order. Attachments (list documents supporting change): Attachment A - PCO #1 - Foundation Preparation for Pump Station 8.4.2021 Attachment B - PCO #2 - EUSERC Panel 9.16.2021 Attachment C - PCO #4 - Generator Pad Size Increase 1.18.2022 Attachment D - PCO #5 - Conduit & Electrical Cable WCD #01 2.15.2022 Attachment E - PCO #6 - Painting Exterior of Pump Station 5.4.2022 Attachment F – PCO #8 – Louver Resize 6.30.2022 EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00941 - 3 CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Price or Times. Changes that affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating Change Orders to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed in the Agreement, any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order should be used. B. COMPLETING THE CHANGE ORDER FORM Engineer normally initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Owner or Contractor for approval, depending on whether the Change Order is a true order to the Contractor or the formalization of a negotiated agreement for a previously performed change. After approval by one contracting party, all copies should be sent to the other party for approval. Engineer should make distribution of executed copies after approval by both parties. If a change only applies to price or to times, cross out the part of the tabulation that does not apply. ATTACHMENT A - PCO #1 Page 1 of 3 ATTACHMENT A - PCO #1 Page 2 of 3 ATTACHMENT A - PCO #1 Page 3 of 3 ATTACHMENT B - PCO #2 Page 1 of 5 ATTACHMENT B - PCO #2 Page 2 of 5 ATTACHMENT B - PCO #2 Page 3 of 5 ATTACHMENT B - PCO #2 Page 4 of 5 ATTACHMENT B - PCO #2 Page 5 of 5 ATTACHMENT C - PCO #4 Page 1 of 14 ATTACHMENT C - PCO #4 Page 2 of 14 ATTACHMENT C - PCO #4 Page 3 of 14 ATTACHMENT C - PCO #4 Page 4 of 14 ATTACHMENT C - PCO #4 Page 5 of 14 ATTACHMENT C - PCO #4 Page 6 of 14 ATTACHMENT C - PCO #4 Page 7 of 14 ATTACHMENT C - PCO #4 Page 8 of 14 ATTACHMENT C - PCO #4 Page 9 of 14 ATTACHMENT C - PCO #4 Page 10 of 14 ATTACHMENT C - PCO #4 Page 11 of 14 ATTACHMENT C - PCO #4 Page 12 of 14 ATTACHMENT C - PCO #4 Page 13 of 14 ATTACHMENT C - PCO #4 Page 14 of 14 ATTACHMENT D - PCO #5 Page 1 of 15 ATTACHMENT D - PCO #5 Page 2 of 15 ATTACHMENT D - PCO #5 Page 3 of 15 ATTACHMENT D - PCO #5 Page 4 of 15 ATTACHMENT D - PCO #5 Page 5 of 15 ATTACHMENT D - PCO #5 Page 6 of 15 ATTACHMENT D - PCO #5 Page 7 of 15 ATTACHMENT D - PCO #5 Page 8 of 15 ATTACHMENT D - PCO #5 Page 9 of 15 ATTACHMENT D - PCO #5 Page 10 of 15 ATTACHMENT D - PCO #5 Page 11 of 15 ATTACHMENT D - PCO #5 Page 12 of 15 ATTACHMENT D - PCO #5 Page 13 of 15 ATTACHMENT D - PCO #5 Page 14 of 15 ATTACHMENT D - PCO #5 Page 15 of 15 ATTACHMENT E - PCO #6 Page 1 of 5 ATTACHMENT E - PCO #6 Page 2 of 5 ATTACHMENT E - PCO #6 Page 3 of 5 ATTACHMENT E - PCO #6 Page 4 of 5 ATTACHMENT E - PCO #6 Page 5 of 5 June 30, 2022 Mr. David Lindsay Colorado Civil Group, Inc Re: St. Vrain Water Treatment Plant Pump Station Resizing of Louver Project #497 PCO #8 Louver Resize Dear David Lindsay This change will result in a add to the Contract of $17,465 and an increase in contract duration of 4 calendar days from the date of approval to deliver the materials to the site and perform the work. Integrated Water Services has completed the work as discussed with the Owner. Should you or the owner have any questions please contatct me at your convienence. Sincerely, INTEGRATED WATER SERVICES, INC. Greg Dills COO IWS is presenting proposed change order #8 for removing and replacing the north side louver in order to provide clearance at switchgear per RFI #15. The scope of each change item attached is hereby limited tot he scope of work and terms & conditions of the proposal presented in this Change Request respective to each change item referenced. 4001 North Valley Drive Longmont, CO 80504 jgerman@integratedwaterservices.com P. (719) 331-5133 Attachment F - PCO #8 Page 1 of 6 06/30/22Re: St. Vrain Water Treatment Plant Pump StationResizing of LouverProject #497PCO #8 Louver ResizeITEMUNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTALNO.QTYUNITCOST COST COST COST COST COST COST COST COST COST COST COSTLaborProject Manager 2 MH 110.00 220.00110.00 220.00Superintendent 2 MH 95.00 190.0095.00 190.00Labor 4 MH 26.00 104.0026.00 104.00Materials (Caulking) 1 LS200.00 200.00200.00 200.00SubcontractorRemove and Replace Louver 1 LS1.00 13,078.00 1.00 13,078.00Block Fill 1 LS1.00 2,200.00 1.00 2,200.00SUMMARYSUBTOTAL - DIRECT COSTS514.00 200.0015,278.00 15,992Labor Burden180Tax Small Tools & Consumables56Equipment Maintenance / FOGSUBTOTAL16,227Overhead & Profit - Self Perform (10%)47Overhead & Profit - Subcontractor (5%)764SUBTOTAL17,039Bonds (2.5%)426TOTAL COST OF PROPOSAL17,465EQUIPMENTTOTALTAXEDMATERIALLABOR MATERIALNON-TAXED SUBCONTRACTORAttachment F - PCO #8Page 2 of 6 Change Order Request 772 — St. Vrain Pump Station COR Subject: Demo Louver & Damper, Install New Louver, Damper & Duct Fittings To Josh Wohlrabe Integrated Water P.O. Box 774565 Steamboat Springs, CO 80477 720-207-5052 Return To Kira Witte Horizon Mechanical Solutions 126 Hemlock St Fort Collins, CO 80524 970-372-0216 970-482-7545 (FAX) kira@horizonmechs.com COR Number: 772-1 COR Revision Number: 0 COR Date: 6/24/2022 Work Type: Price / Proceed Days Valid: 5 Details Line No Code Description Type Cost / Rate Qty / Hrs Workers Ext 001 Journeyman Labor $75.00 20.00 Hrs 1.00 $1500.00 002 Apprentice Labor $55.00 20.00 Hrs 1.00 $1100.00 003 Shop Fab Labor Labor $72.00 8.00 Hrs 1.00 $576.00 004 Louver, Damper, Filter Rack Material $7,450.00 1.00 -$7450.00 005 Aluminum Duct and Fittings Material $600.00 1.00 -$600.00 Breakout Labor : $3,176.00 Gross Margin Percent @ 10%: $317.60 Overhead Percent @ 5%: $158.80 Bond Percent/Sales Tax @ 1.5%: $47.64 Attachment F - PCO #8 Page 3 of 6 6/24/2022 Material : $8,050.00 Gross Margin Percent @ 10%: $805.00 Overhead Percent @ 5%: $402.50 Bond Percent/Sales Tax @ 1.5%: $120.75 _____________ Total: $13,078.00 Reservation of Rights This COR does not include any amount for impacts such as interference, disruptions, rescheduling, changes in the sequence of work, delays and/or associated acceleration. We expressly reserve the right to submit our request for any of these items. Due to the fluctuation of commodities, we are adhering to the VALID FOR Days on current change orders. Due to market volatilities, Horizon shall not be responsible for material delays due to manufacturing delays caused by our vendors. ARCHITECT Address BY DATE CONTRACTOR Address BY DATE OWNER Address BY DATE Attachment F - PCO #8 Page 4 of 6 Back-up-for-CO-RFI-15.pdf Attachment F - PCO #8 Page 5 of 6 Price for Filter Rackonly.Attachment F - PCO #8Page 6 of 6